cabling
See
connections
cache
disable
mode
jumper
settings
5-7
card
cage
access
5-2
slots
1-4
card
illustrations
5-185-25
card
numbering
fundamentals
5-3
See
also
switches
cards
included
with
the chassis
2-11
caution
chassis
installation
3-1
placement
3-1
3-2
chassis
installation
3-1
chassis
placement
3-2
configuration
register
4-8
description
xv
ESD
prevention
2-3
installation
problems
3-3
maximum
Token
Ring
configuration
1-7
NYRAIVI
overwrite
4-8
safety
5-1
system
restart
4-5
Token
Ring speed
CSC-1R
and
CSC-2R
5-15
CSC-R16M
5-17
with
diagnostic
tests
4-6
central
processing
unit
See
CPU
channel
service
unit
See
CSUIDSU
chassis
access
procedure
5-2
air
flow warning
threshold
2-4
air
flow warnings
4-4
air
temperature
2-4
blower
5-17
card
cage
slots
1-4
card
limitations
1-7
components
included
2-11
cooling
2-5
dimensions
1-3
equipment
racks
precautions
2-5
front-panel
view
1-1
installing
3-1
limitations
for the
CSC-P
F-2
maintenance
overview
5-1
network
interfaces
1-6
opening and
tools required
5-1
operating
conditions
2-3
placement
2-4
2-5
power
budget
calculation
1-9
power
supply
5-17
precautions
vertical
clearance
2-5
rear-panel
view
1-2
reassembly
5-2
record
keeping
installation
checklist
2-6
specifications
1-3
storage
considerations
2-4
temperature
warning
threshold
2-4
troubleshooting
shutdown
4-6
ventilation
2-5
voltage
warnings
4-4
weight
1-3
wiring
closets
precautions
2-5
checklist
installation
procedures
2-6
ciscoBus
backplane
1-3
card
cage
slots
1-4
controller
card See
CSC-CCTL
and
CSC-CCTL2
clock
rate settings
5-10
clock
signals
internal
transmit
HSSI
A-li
serial interface
cards
5-il
clock
speed
processor
cards
1-4
clocking
options
CSC-SCI
and
CSC-MCI
jumpers
5-li
5-12
clockrate
command
5-10
color
codes
industry
standard
wiring
C-i
commands
boot
5-5
boot system
flash
5-5
ciockrate
5-10
debug
5-6
diagnostic
tests
4-7
hssi external
ioop
request
B-12
hssi internal
clock
A-il
loopback
A-17
menlory
test
4-7
no
clockrate
5-10
no
hssi external
loop
request
B-12
no
hssi internal
clock
A-12
reload
5-4
show
environment
4-4
show
environment
last
4-6
write
memory
5-10
compliance
provisions
for the
United
Kingdom
D-i
components
included
with
chassis
2-il
configuration
register
at
system
restart
5-4
boot
field
5-5
boot filename
5-5
boot system
flash feature
jumpers
5-5
caution
4-8
description
5-4
diagnostic
mode
jumper
5-6
IP
broadcast
address jumper
settings
5-6
jumper
settings
5-4
5-5
location
5-4
AGS
Hardware
Installation
and Maintenance
Содержание AGS+
Страница 1: ...CISCO SYSTEMS ...
Страница 11: ...AGS Hardware Installation and Maintenance ...
Страница 17: ...Document Conventions xvi AGS Hardware Installation and Maintenance ...
Страница 27: ...Chassis Power Budget 1 10 AGS Hardware Installation and Maintenance ...
Страница 39: ...Chassis Components 2 12 AGS Hardware Installation and Maintenance ...
Страница 57: ...System Bootstrap Diagnostics 4 10 AGS Hardware Installation and Maintenance ...
Страница 83: ...Card Illustrations 5 26 AGS Hardware Installation and Maintenance ...
Страница 105: ...FOOl Optical Bypass Switch Pinout A 22 AGS Hardware Installation and Maintenance ...
Страница 121: ...Applique LED Indicators B lB AGS Hardware Installation and Maintenance ...
Страница 125: ...C 4 ACS Hardware Installation and Maintenance ...
Страница 127: ...Compliance Provisions D 2 AGS Hardware Installation and Maintenance ...
Страница 129: ...E 2 AGS Hardware Installation and Maintenance ...