Index
IN-3
Cisco AS5400 Universal Gateway Chassis Installation Guide
OL-2847-02 0A
fan removal (figure)
B-7
Figures
Attaching the Chassis to the 19-Inch Rack—Rear Panel
Forward
3-5
Attaching the Rubber Feet
3-3
BITS Port Connection
C-5
Cisco AS5400 Chassis
A-14
,
B-19
Cisco AS5400 Front Panel
1-2
Cisco AS5400 Rear Panel
1-2
Connecting a Modem to the Auxiliary Port
3-11
Connecting the 6-Pin Connector to the System
Board
B-13
Connecting the AC Power Cord
3-14
Connecting the Auxiliary Port to a Modem
C-4
Connecting the Console Port to a Terminal
C-3
Connecting the Console Port to the PC
C-2
Connecting the Console Terminal
3-10
Connecting to a CSU/DSU
3-9
Connecting to an E1 CSU/DSU
3-8
Connecting to an Ethernet Hub
3-6
Connecting to the Alarm Port
3-12
Connecting to the BITS Port
3-11
Correct Fan Cable Routing
B-17
DC Power Supply Connections
3-15
,
A-3
,
A-15
,
B-3
,
B-20
Disconnecting the Fan Cable
B-9
Disconnecting the Power Connectors from the
Backplane
B-10
Flash SIMM Module for the Cisco AS5400
A-11
Flash SIMM Module for the Cisco AS5400HPX
A-10
Inserting the Flash Memory SIMM
A-13
Inserting the New SDRAMM DIMM into the
Socket
A-9
Inserting the Power Supply in the Chassis
B-12
Lifting the Power Supply Out of the Chassis
B-11
Pulling the Fan Away from the Tabs
B-7
rear panel LEDs
4-2
Reconnecting the Fan Cables
B-16
Reconnecting the Power Cables to the Backplane
B-14
Removing Flash Memory SIMM
A-12
Removing the Air Separator
B-7
Removing the Chassis Cover
A-4
,
B-5
Removing the Chassis Cover Screws
A-4
,
B-4
Removing the Fan
B-8
Removing the Power Supply Mounting Screws
B-6
Removing the SDRAMM DIMM
A-8
Replacing the Air Separator
B-17
Replacing the Chassis Cover
A-14
,
B-19
Replacing the Redundant Power Supply Mounting
Screws
B-18
Rollover Cable
C-2
Routing the Fan Cables
B-15
Standard Bracket Installation—Front Panel
Forward
3-4
Standard Bracket Installation—Rear Panel
Forward
3-5
Standard Rack-Mount Brackets
3-4
System Board Layout
A-6
WAN connection to RJ-45 jack
3-7
Flash memory identification
A-10
Flash memory SIMMs, replacing
A-9
G
ground connection warning
2-2
,
3-2
grounded equipment warning
3-1
H
hardware features, new
xiii
hazardous voltages in WAN ports warning
2-4
,
3-7
help, getting
4-9
humidity specification
1-3
I
identifying the universal gateway
1-1
,
4-1
,
4-9
,
A-10
images, troubleshooting
4-8
impedance, E1
2-4
impedance, T1
2-4
Содержание 5428 - SN Router
Страница 6: ...Contents vi Cisco AS5400 Universal Gateway Chassis Installation Guide OL 2847 02 0A ...
Страница 14: ...xiv Cisco AS5400 Universal Gateway Chassis Installation Guide OL 2847 02 0A Preface New Hardware Features ...
Страница 106: ...Index IN 8 Cisco AS5400 Universal Gateway Chassis Installation Guide OL 2847 02 0A ...