vii
Catalyst 3750 Switch Hardware Installation Guide
78-15136-02
Contents
U.S.A.
3-4
Taiwan
3-4
Japan
3-4
Korea
3-5
Hungary
3-5
Installation Guidelines
3-6
Verifying Package Contents
3-7
Verifying Switch Operation
3-8
Connecting a PC or Terminal to the Console Port
3-8
Powering On the Switch and Running POST
3-10
Powering Off the Switch and Disconnecting the Console Port
3-11
Planning the Stack
3-12
Planning Considerations
3-12
Powering Considerations
3-13
Cabling Considerations
3-14
Recommended Cabling Configurations
3-15
Installing the Switch
3-17
Rack Mounting
3-18
Removing Screws from the Switch
3-19
Attaching Brackets to the Catalyst 3750G-24TS Switch
3-20
Attaching Brackets to the Catalyst 3750-24TS, 3750G-24T, 3750G-12S,
and 3750-48TS Switches
3-25
Mounting the Switch in a Rack
3-28
Attaching the Cable Guide
3-30
Wall Mounting
3-32
Attaching the Brackets to the Switch for Wall-Mounting
3-32
Attaching the RPS Connector Cover
3-33
Mounting the Switch on a Wall
3-34
Table or Shelf Mounting
3-36
Connecting StackWise Cable to StackWise Ports
3-37
Содержание 2651XM-V
Страница 6: ......
Страница 22: ...Preface Conventions xx Catalyst 3750 Switch Hardware Installation Guide 78 15136 02 ...
Страница 124: ...Appendix A Technical Specifications A 6 Catalyst 3750 Switch Hardware Installation Guide 78 15136 02 ...
Страница 198: ...Index IN 8 Catalyst 3750 Switch Hardware Installation Guide 78 15136 02 ...