C H A P T E R
3-1
Catalyst 3750 Switch Hardware Installation Guide
78-15136-02
3
Switch Installation
This chapter describes how to start your switch and how to interpret the power-on
self-test (POST) that ensures proper operation. It describes the planning and
cabling considerations to keep in mind while planning your stack. It describes
how to install the switch and make connections to the switch. Read the topics and
perform the procedures in this order:
•
Preparing for Installation, page 3-1
•
Verifying Switch Operation, page 3-8
•
Planning the Stack, page 3-12
•
Installing the Switch, page 3-17
•
Connecting StackWise Cable to StackWise Ports, page 3-37
•
Connecting to the 10/100 and 10/100/1000 Ports, page 3-44
•
Connecting to an SFP Module, page 3-46
•
Where to Go Next, page 3-50
Preparing for Installation
This section covers these topics:
•
Warnings, page 3-2
•
EMC Regulatory Statements, page 3-4
•
Installation Guidelines, page 3-6
Содержание 2651XM-V
Страница 6: ......
Страница 22: ...Preface Conventions xx Catalyst 3750 Switch Hardware Installation Guide 78 15136 02 ...
Страница 124: ...Appendix A Technical Specifications A 6 Catalyst 3750 Switch Hardware Installation Guide 78 15136 02 ...
Страница 198: ...Index IN 8 Catalyst 3750 Switch Hardware Installation Guide 78 15136 02 ...