3. Hang from the ceiling:
Lifting nut
Installation hole 1
First, ensure that the ceiling can support the weight of the screen. As
pictured above, install the lifting nut from the accessory case into the
mounting clip. Measure and draw a reference line on the ceiling as a
guide to ensure the screen is centered and leveled. You will require
two “wired eye lags” or “eye screws” and two equal lengths of chain to
suspend the screen from the ceiling. Consult your local hardware store
to obtain the appropriate equipment. Use a stud finder to locate the
joists that are located to the outer most limits of your reference line.
Note: once the screen is placed into the clips, the screen can slide into
a centered position; hence mount placement does not have to be exact.
Start with the left side, place the upper side of the mounting clip to meet
the reference line and the joist, hold it in place and draw two circles
using the installation holes depicted above. Take away the wall mount
and pre-drill both holes. Now install the clip using the expansion bolts
recommended. Before the clip is screwed in taut use a level to make
sure the clip is level. Attach the chain to the eye screw and clip. Repeat
these steps for the right side.
The method to install the screen into the mounting clips will
be the same for all
A.
Lift the screen to the top of the mounting
clip until the slot of the screen meets the top tray
as depicted to the left.
B.
Pull the “Ring Pull” down via the “Loop” on the
bracket, then push the screen back horizontally.
Release the “Loop” to engage the bracket with
the screen housing.
C. To dismount the screen.
Have two people (one on each
side of the screen) hold and pull down the ring-pulls so that
the hook detaches from the slot, and then pull the screen off
the mounting clip horizontally as depicted below.