9
Instruction Manual
VLOG-10
3.4.- CONNECTION DIAGRAMS
USB
N
L
POWER SUPPL
Y
POWER
SA
MPLING
EVENT
LOG RESE
T
L
N
CARGA / LOAD
Figure 2:VLOG-10 connection diagram�
3.5.- START-UP
It is necessary to follow these steps before starting the device:
1�-
Remove the seal from the internal battery. To do this, pull the seal in the direction of the
arrow, as shown in,
Figure 3
.
USB
N
L
POWER SUPPLY
POWER
SAMPLING
EVENT
LOG RESET
Precinto / Seal
Figure 3:Seal from the internal battery�
2�-
Configure the device. To do this, connect the device to the USB port of a PC and follow the
instructions described in section “
5.- DISPLAY AND CONFIGURATION.”,
to install the
VLOG-10
Software
configuration application.
Содержание VLOG-10
Страница 1: ...INSTRUCTION MANUAL Power quality analyser VLOG 10 M091B01 03 18A...
Страница 2: ...2 VLOG 10 Instruction Manual...
Страница 25: ...25 Instruction Manual VLOG 10 116 26 43 Figure 21 VLOG 10 dimensions...
Страница 27: ...27 Instruction Manual VLOG 10 9 CE CERTIFICATE...
Страница 28: ...28 VLOG 10 Instruction Manual...
Страница 29: ...29 Instruction Manual VLOG 10...