F
Verification
1 — P OW E R I N P U T
Before proceeding, make sure voltage is present in the terminal blocks.
2 — M A I N T E N A N C E M O D E
Pull outward the Tamper Switch located in the lower half of the Charge Point.
3 — CA R E F U L W I T H T H E W I R E S
When closing the unit, keep in mind all cables should remain inside.
4 — C H E C K T H E P LU G S
Plugs should be in good conditions before starting the unit.
5 — E L E C T R I CA L P R OT E C T I O N S
Rearm all the protections installed on the unit.
6 — C H E C K T H E B E AC O N I N D I CATO R S
All beacon indicators should light properly. Here’s the reference:
PLUG
STATE
BEACON COLOR
Available
Green
Charging
Blue
Fault
Red
7 — O P E R AT I O N
Check no abnormal noise appears while the unit is charging.
For Three-Phase models pay special attention to Neutral Cable.
19
Installation Guide
URBAN
Содержание URBAN M21
Страница 1: ...URBAN Series INSTALLATION GUIDE M177A01 03 19A...
Страница 4: ...1 04 URBAN Installation Guide...
Страница 12: ...3 446 438 288 234 1544 1351 113 80 180 Measures in mm 12 URBAN Installation Guide...
Страница 14: ...4 A 1 2 Opening Use provided key in order to open the unit Key type saw EMKA EK333 14 URBAN Installation Guide...
Страница 16: ...Firmly tighten the 4 nuts using a 24mm open end wrench C Fixation 16 URBAN Installation Guide...