Raption 150C
Instruction Manual
84
Go to the
Setup Webpage
→
‘Integrations’
tab →
‘General’
tab
Choose the option selected under
‘Available integrations’
according to your backend policies
as shown in the picture:
Note:
Charge Point is working as stand-alone if
‘none’
option is selected. All ID cards are
authorized to start/stop a new charge transaction and no requests are sent to the backend.
Charge Point supports different versions of OCPP but only one can be enabled at the same
time.
When done, please do not forget to save changes pressing
‘Apply’
button just below the
option list.
Содержание RAPTION 150C CCS CHA
Страница 1: ...Raption 150C Series INSTRUCTION MANUAL M358B01 03 22A...
Страница 2: ...Raption 150C Instruction Manual 2...
Страница 10: ...Raption 150C Instruction Manual 10 C Dimensions Units specified in millimeters 1290 1140 1910 550 610 460...
Страница 32: ...Raption 150C Instruction Manual 32 3 CONNECTOR DISABLED 4 CONNECTOR IN USE...
Страница 35: ...Raption 150C Instruction Manual 35...
Страница 59: ...Raption 150C Instruction Manual 59...
Страница 93: ...Raption 150C Instruction Manual 93...
Страница 101: ...Raption 150C Instruction Manual 101 Go to the Setup Webpage Integrations Configuration keys tab...
Страница 107: ...Raption 150C Instruction Manual 107 Monitoring...
Страница 115: ...Raption 150C Instruction Manual 115...
Страница 118: ...Raption 150C Instruction Manual 118...