5.- MAINTENANCE
5.1.- SAFETY REGULATIONS
Take the safety regulations listed in section of this manual into account before
operating the units
“3.1.- PRELIMINARY RECOMMENDATIONS”
The National Electric Code of the country where the capacitor bank is installed or
operated should be strictly followed.
5.2.- MAINTENANCE WITH THE CAPACITOR BANK DISCONNECTED
5.2.1. BASIC MAINTENANCE PROTOCOL
Monthly:
Visually inspect the capacitors.
Check the protection fuse.
Control the ambient temperature (average of 35 ºC. In accordance with IEC 60831 ).
Control the service voltage (especially during moments of low load, it must not exceed
the n10%).
Bi-annually:
Keep the capacitor terminals clean.
Verify the state of the contacts of operating elements.
Check that the capacitor current is not lower than 25% nor greater than 120% of the
nominal value by phase and that there is no phase unbalance greater than 15%.
Annually:
Carry out a dielectric rigidity test by applying
2.5 kV
for
1
second between the terminals
of the capacitor and earth.
Check the capacity of the capacitors at the different steps.
One indirect check may be to check that the consumption is manual.
Check the tightness of all terminal connections.
Inspect the fuses.
-
Power Circuit
:
NH fuses. Check continuity and temperature.
-
Power Circuit
:
Check the continuity and temperature of the three-pole or four-pole
circuit breaker.
-
Control Circuit:
Check the continuity and temperature of the two-pole circuit breaker.
18
OPTIM P&P Series
Instruction Manual
Содержание OPTIM 9 P&P-225-440
Страница 1: ...INSTRUCTION MANUAL M063B01 03 19A Low voltage capacitor banks switched by contactors OPTIM P P Series ...
Страница 2: ...2 OPTIM P P Series Instruction Manual ...
Страница 36: ...10 CE CERTIFICATE 36 OPTIM P P Series Instruction Manual ...
Страница 37: ...37 Instruction Manual OPTIM P P Series ...
Страница 38: ...38 OPTIM P P Series Instruction Manual ...
Страница 39: ...39 Instruction Manual OPTIM P P Series ...