12 

 

4.4.1.1.4. 

Screen L14 (CONTRACT 1: CLOSURE 03) 

Shows information on the values for contract 1 from the ante penultimate closure. The 

screen acts the same as for L12.. 

The information is displayed in exactly the same way as in screen L12, but field F will 

have the value 03 instead of 01. 

Fox  example:  1.18.1.03 

  Absolute  active  energy  consumed,  from  period  1,  bill 

closure 3. 

4.4.1.1.5. 

Screen L15 (CONTRACT 1: CLOSURE 04) 

Shows information on the values for contract 1 from closure 04. The screen acts the 

same as for L12.. 

The information is displayed in exactly the same way as in screen L12, but field F will 

have the value 04 instead of 01. 

Fox  example:  1.18.1.04 

  Absolute  active  energy  consumed,  from  period  1,  bill 

closure 4 

4.4.1.1.6. 

Screen L16 (CONTRACT 1: CLOSURE 05) 

Shows information on the values for contract 1 from closure 05. The screen acts the 

same as for L12.. 

The information is displayed in exactly the same way as in screen L12, but field F will 

have the value 05 instead of 01. 

Fox  example:  1.18.1.05 

  Absolute  active  energy  consumed,  from  period  1,  bill 

closure 5. 

4.4.1.1.7. 

Screen L17 (CONTRACT 1) CLOSURE 06) 

Shows information on the values for contract 1 from closure 06. The screen acts the 

same as for L12.. 

The information is displayed in exactly the same way as in screen L12, but field F will 

have the value 06 instead of 01. 

Fox  example:  1.18.1.06 

  Absolute  active  energy  consumed,  from  period  1,  bill 

closure 6. 

 

 

4.4.1.2.- 

Screen L2 (CONTRACT 2)  

This screen accesses information on contract 2. It acts in the same way as L1. 

All data screens that depend on this screen have the value 2 in group B of the code. 

 

4.4.1.2.1. 

Screen L21 (CONTRACT 2: CURRENT) 

This shows information on the current values for contract 2.  It acts in the same way 

as  screen  L11,  but  changes  the  group  B  code  from  1  to  2.  The  information  is  displayed  in 
exactly the same way as in screen L11, except for Power Excesses, which will not appear 

Data is displayed with zeros to the left to fill up the length of the display. 

Fox  example:  2.16.2 

  Absolute,  current  maximum  demand  for  period  2  and  for 

contract 2. 

 

Содержание CIRWATT Series

Страница 1: ...MULTI PURPOSE THREE PHASE METER CIRWATT Series Version 4 xx Installation Manual M98166301 03 05A c CIRCUTOR S A...

Страница 2: ...AND BY mode screen 6 4 4 READING screens mode 7 4 4 1 1 Screen L1 CONTRACT 1 8 4 4 1 2 Screen L2 CONTRACT 2 12 4 4 1 3 Screen L3 CONTRACT 3 13 4 4 1 4 Screen L4 INFORMATION 15 4 4 1 5 Screen L5 INFO F...

Страница 3: ...ion options covering the needs of each installation are shown below Meter version CIRWATT 4 wire 3 wire 4 Connection mode Class 0 5S active Class 1 reactive 05 Class 0 2S active Class 0 5 reactive 02...

Страница 4: ...ACTIVE TARIFF Using the key the menus may be accessed And with the key it is possible to move through the menu The units and resolution of the energy values are the same as for the meter overflow val...

Страница 5: ...READING mode is not activated by pressing the corresponding reading button s this screen will always appear as a default 4 1 2 READING Mode This is activated by pressing entering the variable selecti...

Страница 6: ...display 4 line screen the second is a SCROLL screen presenting different information in a different way after a time 4 2 2 Menu Screen The MENU screen presents different options to access data screen...

Страница 7: ...Non critical alarm not affecting measurement creating a meter malfunction This will be flashing B Low battery alarm This will be flashing R P Special parameter mode activated Code field B C D E F xxx...

Страница 8: ...IERS L47 OUTPUT CONSTANTS SALIDA L48 CLOCK CHANGE BACK L1 ConTRACT 1 L11 CURRENT L31 CURRENT L12 CLOSURE 1 L32 CLOSURE 1 L13 CLOSURE 2 L33 CLOSURE 2 L14 CLOSURE 3 L34 CLOSURE 3 L15 CLOSURE 4 L35 CLOSU...

Страница 9: ...for contract 1 closure 5 FIMOL 0 GG SS Accesses values for contract 1 closure 6 oldest L1 e Returns to the previous screen 4 4 1 1 1 Screen L11 CONTRACT 1 CURRENT This screen shows information on the...

Страница 10: ...4 MAXDEM T4 C1 CUR MAXIMUMS 1 16 5 MAXDEM T4 C1 CUR MAXIMUMS 1 16 6 MAXDEM T6 C1 CUR MAXIMUMS 1 16 0 MAXDEM TOTAL C1 CUR Maximums from bill closure if active included in the total period 0 1 16 x whe...

Страница 11: ...TAL C1 b01 1 19 x 01 donde x tarifa per odo KVARL 1 59 1 01 INCQ1 T1 C1 b01 KVARL 1 59 2 01 INCQ1 T2 C1 b01 KVARL 1 59 3 01 INCQ1 T3 C1 b01 KVARL 1 59 4 01 INCQ1 T4 C1 b01 KVARL 1 59 5 01 INCQ1 T5 C1...

Страница 12: ...Power Excesses 1 12 1 01 EXCES T1 C1 b01 Power Excesses 1 12 2 01 EXCES T2 C1 b01 Power Excesses 1 12 3 01 EXCES T3 C1 b01 Power Excesses 1 12 4 01 EXCES T4 C1 b01 Power Excesses 1 12 5 01 EXCES T5 C...

Страница 13: ...12 but field F will have the value 05 instead of 01 Fox example 1 18 1 05 Absolute active energy consumed from period 1 bill closure 5 4 4 1 1 7 Screen L17 CONTRACT 1 CLOSURE 06 Shows information on t...

Страница 14: ...code changes from 1 to 3 As contract 3 is valid for both the purchase and sale of energy the data codes will depend on the contract being set for one or other energy direction This is applicable both...

Страница 15: ...luded in the total 3 29 x 01 where x tariff period KVARL 3 69 1 ABSQ2 T1 C3 CUR KVARL 3 69 2 ABSQ2 T2 C3 CUR KVARL 3 69 3 ABSQ2 T3 C3 CUR KVARL 3 69 4 ABSQ2 T4 C3 CUR KVARL 3 69 5 ABSQ2 T5 C3 CUR KVAR...

Страница 16: ...TS This shows information on the output impulse values L48 TIME CHANGE This shows information on the dates of the time change L49 BACK Returns to the previous screen 4 4 1 4 1 Screen L40 INFORMATION I...

Страница 17: ...TRACTED POWERS This is for the values of the contracted powers in kW to 2 decimals that will be used to calculate excesses 1 135 x where x tariff period 4 4 1 4 3 Screen L42 INFORMATION TRANSFORMATION...

Страница 18: ...ve Energy in Quadrant 1 0 68 0 Q2 TOTAL R2 This shows the current total for Reactive Energy in Quadrant 2 0 78 0 Q3 TOTAL R3 This shows the current total for Reactive Energy in Quadrant 3 0 88 0 Q3 TO...

Страница 19: ...in each of the three phases with its sign 0 37 0 Q kvar INSTANT REACTIVE POWER This shows the total instant Reactive Power in each of the three phases with its sign L44 NSTANT 0 137 0 FP 3PH AVERAGE...

Страница 20: ...shows the integration period in minutes 60 minutes as a default L46 IDENTIFIERS 0 08 5 INTGP2 INTEGRATION PERIOD OF THE SECOND LOAD CURVE this shows the integration period of the second load curve in...

Страница 21: ...TIME CHANGE Shows the date and time of the Winter Summer time change L48 TIME CHANGE 0 00 9 S W SUMMER WINTER TIME CHANGE Shows the date and time of the Summer Winter time change 4 4 1 5 Screen L5 INF...

Страница 22: ...us This screen identifies the status of the equipment Lohhcha ill_ n 4 4 1 5 5 Contrast The display contrast is shown on this screen 4 4 1 5 6 Horas tarificaci n Tariff Hours This screen indicate the...

Страница 23: ...according to type Frequency 50 Hz or 60 Hz Current measurement Nominal current base 5A or 1 A for direct measurement Maximum current 10 A or 20 A 2 x In for indirect measurement Accuracy According to...

Страница 24: ...5 230 150 22 Optical Reader Protocols Reading Writing for local access IEC 870 5 102 Modbus RTU Zmodem and IEC 6117 Series port According to model Indirect meters R2 COM2 User Protocols RS 232 or RS...

Страница 25: ...bel on terminal cover R2 R1 1 2 4 3 11 6 5 7 8 9 21 22 24 34 23 33 30 26 31 25 35 27 32 28 29 No 1 2 3 4 5 6 7 8 9 11 R1 R2 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 Terminal description Lower boar...

Страница 26: ...iagram will vary The required connection diagram is located inside the terminal cover Indirect meters 5A and 1A 3 4 wire connection Low Voltage 4 wire connection 3 voltage transformers and 3 current t...

Страница 27: ...hours of use has reached its average working life 10 years The hours of use may be easily checked via the display 8 TECHNICAL SERVICE In the event of any equipment failure or any operational queries p...

Страница 28: ...m R2 R1 1 2 4 3 11 6 5 7 8 9 21 22 24 34 23 33 30 26 31 25 35 27 32 28 29 Connection to a PC RS 232 RS 485 RJ Cirwatt Connector CIRWATT P C DB9 CIRWATT Converter DB9 1 GND 5 GND 1 GND 5 GND 2 RX 3 Tx...

Страница 29: ...cover Change the battery Attach the battery compartment cover Tighten the screws that hold the cover The battery may be changed with or without the equipment being connected The equipment has a SUPER...

Страница 30: ...ower sign and its corresponding energy quadrant used by the CIRWATT meter 1 st Quadrant 4 th Quadrant 3 rd Quadrant 2 nd Quadrant Active generated Active consumed 1 st Quadrant 2 nd Quadrant 3 rd Quad...

Отзывы: