4. Indicator Nut Installation

4.1. Select the corresponding Indicator Nut for the fi tting pre-set.

    A.

 Black

 Indicator Nut is used with size 1/2” (12mm) only

    B. 

Grey

 Indicator Nut is used with size 5/8” (14mm) and 

      above 

fi 

ttings

 

 

4.2.  With the Indicator Arm in the release position, screw the

 

 

 

Indicator Nut on to the threaded piston shaft. 

5. Tube Preparation

5.1  

Ensure the tube outside diameter wall thickness and hardness 

 

 

is within acceptable specifi cations. Free from scratches, 

 

 

indentations and fl at surfaces.

5.2  

Make a square cut and remove any burrs from the end of 

  the 

tubing.

6. Ferrule Pre-Setting Procedure

6.1  

With the Pre-Setting head in the desired location, ensure 

 

 

the Indicator Arm is in the released position and the 

 

 

required Die and Jig set installed.

6.2  

Open the release valve on the hand pump 

 

 

(turn counter-clockwise). Insure the end of the Die is 

 

 

back from the end of the threaded portion of the Jig.

 

 

 

 

 

  

 

 

5

Содержание HOKE 3HPST

Страница 1: ...Continuously Improving Flow Control HOKE 3HPST User Instructions Continuously Improving Flow Control...

Страница 2: ...1 Connect hand pump to Pre Setting head The hand pump is supplied with a hose connected Therefore the free end needs to be connected to the Pre Setting head 1 1 Remove the hand pump and Pre Setting he...

Страница 3: ...the System Bleeding process prior to using the tool and whenever any part of the hydraulic system has been disconnected 2 1 Position the hand pump at a higher elevation than the Pre Setting head this...

Страница 4: ...p the Die and Jig as a matched pair and stored in the black case when not in use 3 1 Select the corresponding Die and Jig set to the desired tube size you wish to pre set Make sure the Die and Jig is...

Страница 5: ...elease position screw the Indicator Nut on to the threaded piston shaft 5 Tube Preparation 5 1 Ensure the tube outside diameter wall thickness and hardness is within acceptable specifications Free fro...

Страница 6: ...hand pump release valve turn clockwise 6 6 Pump the handle until the indicator arm releases CAUTION Stop pumping immediately after the arm releases as over pumping may cause the tube to swell and stic...

Страница 7: ...The initial fitting make up is now complete 8 Dismantle Store Unit 8 1 Open the Hand pump release valve 8 2 Remove the Die and Jig from the Pre Setting head by first unscrewing the Die Fixing bolt us...

Страница 8: ...ive plug removed and stored earlier 8 6 Store clean components and accessories in the black case 8 7 Lay the black case down horizontally when possible during storage PRE SETTING HEAD HAND PUMP HOSE H...

Страница 9: ...with each other to create optimal driving force to seat the ferrules to the tube and create a leak tight connection The installation of used ttings and bodies may cause unintended leakage due to the...

Страница 10: ...registered facility headquartered in Spartanburg SC USA a division of CIRCOR International NYSE CIR HOKE distributors are worldwide Contact us or visit our website to locate the nearest distributor t...

Отзывы: