Flexibility to
Your
Demand
Short &
Stable Lead
Times
Management
of Change
Services
Fit For
Purpose
Products with
Reduced
Variability
Resource
Optimization by
Addressing Your
Instrumentation
Needs
4. Indicator Nut Installation
4.1. Select the corresponding Indicator Nut for the fi tting pre-set.
A.
Black
Indicator Nut is used with size 1/2” (12mm) only
B.
Grey
Indicator Nut is used with size 5/8” (14mm) and
above
fi
ttings
4.2. With the Indicator Arm in the release position, screw the
Indicator Nut on to the threaded piston shaft.
5. Tube Preparation
5.1
Ensure the tube outside diameter wall thickness and hardness
is within acceptable specifi cations. Free from scratches,
indentations and fl at surfaces.
5.2
Make a square cut and remove any burrs from the end of
the
tubing.
6. Ferrule Pre-Setting Procedure
6.1
With the Pre-Setting head in the desired location, ensure
the Indicator Arm is in the released position and the
required Die and Jig set installed.
6.2
Open the release valve on the hand pump
(turn counter-clockwise). Insure the end of the Die is
back from the end of the threaded portion of the Jig.
5