background image

1.3  

Remove the protective plug from the inlet connector on the 

 

 

Pre-Setting head, turn counter-clockwise. Keep the plug in a

 

 

safe place, such as in the black case.

 

 

1.4  

Connect the free end of the hand pump hose to the inlet

 

 

connector on the Pre-Setting head tightening the male and

 

 

female couplers together.

3

  

 

2. System Bleeding (Air Removal)

 

Perform the System Bleeding process prior to using the tool and

 

whenever any part of the hydraulic system has been disconnected.

2.1  

Position the hand pump at a higher elevation than the 

 

 

Pre-Setting head; this will help in chasing any trapped air out of

 

 

the hydraulic system. (See FIG 1, below)

2.2  

Vent hand pump reservoir, by 

 

 

turning the fi ll cap a 1/4 of a 

 

 

turn to the “VENT”  position and 

 

 

ensure the hand pump release 

 

 

valve is closed. 

2.3. 

Turn release valve handle clockwise. Ensure the vent end of the

 

 

Hand Pump reservoir is the highest point in the system.

    

 

 

 

Содержание HOKE 3HPST

Страница 1: ...Continuously Improving Flow Control HOKE 3HPST User Instructions Continuously Improving Flow Control...

Страница 2: ...1 Connect hand pump to Pre Setting head The hand pump is supplied with a hose connected Therefore the free end needs to be connected to the Pre Setting head 1 1 Remove the hand pump and Pre Setting he...

Страница 3: ...the System Bleeding process prior to using the tool and whenever any part of the hydraulic system has been disconnected 2 1 Position the hand pump at a higher elevation than the Pre Setting head this...

Страница 4: ...p the Die and Jig as a matched pair and stored in the black case when not in use 3 1 Select the corresponding Die and Jig set to the desired tube size you wish to pre set Make sure the Die and Jig is...

Страница 5: ...elease position screw the Indicator Nut on to the threaded piston shaft 5 Tube Preparation 5 1 Ensure the tube outside diameter wall thickness and hardness is within acceptable specifications Free fro...

Страница 6: ...hand pump release valve turn clockwise 6 6 Pump the handle until the indicator arm releases CAUTION Stop pumping immediately after the arm releases as over pumping may cause the tube to swell and stic...

Страница 7: ...The initial fitting make up is now complete 8 Dismantle Store Unit 8 1 Open the Hand pump release valve 8 2 Remove the Die and Jig from the Pre Setting head by first unscrewing the Die Fixing bolt us...

Страница 8: ...ive plug removed and stored earlier 8 6 Store clean components and accessories in the black case 8 7 Lay the black case down horizontally when possible during storage PRE SETTING HEAD HAND PUMP HOSE H...

Страница 9: ...with each other to create optimal driving force to seat the ferrules to the tube and create a leak tight connection The installation of used ttings and bodies may cause unintended leakage due to the...

Страница 10: ...registered facility headquartered in Spartanburg SC USA a division of CIRCOR International NYSE CIR HOKE distributors are worldwide Contact us or visit our website to locate the nearest distributor t...

Отзывы: