background image

 

 

 

 

A  About this Document 

 

This manual: 

o

  Is part of the Imo Pump 

o

  Applies to all Imo Pump models / series 

o

  Provides instructions describing safe and appropriate methods for general installation, operation 

and trouble shooting of the pump 

 

i

 

NOTE

 

 

Contract terms may have specific provisions which vary from what is shown in this manual! 
Should any questions arise which are not answered by these instructions, refer to the correct 
Original Installation, Care and Maintenance Instructions.

 

 

A.1  Target Groups 

 

Target group 

Duty 

Operating company 

  Keep this manual available at the site of operation of the 

equipment, including for later use 

  

  Ensure that personnel read and follow the instructions in this 

manual and the other applicable documents, especially all 
safety instructions and warnings. 

  

  Observe any additional rules and regulations referring to the 

pump or system. 

Specialized Personnel, Fitters, 
Operators 

  Read, observe and follow this manual and the other applicable 

documents, especially all safety instructions and warnings. 

 

A.2  Other Applicable Documents 

 
 

 

Document 

Purpose 

Product Service Manual 

Detailed instructions for inspection, disassembly, 
repair and reassembly of a specific pump model or 
series. 

Original Installation, General Maintenance and 
Troubleshooting Manual (SRM00101)  

Detailed instructions for installation, general 
maintenance and troubleshooting.  

Assembly Drawings, Parts List / Bill-of-Materials 

Drawings of the pump assembly and Sub-assemblies 
Parts List and Bill-of-Materials listing components 

ATEX - Additional Instructions for 3-Screw and 
CIG Gear Pumps in Gas Explosive Atmospheres 
(SRM00092) 

 If Applicable 

 

Operation in explosion-hazard areas 

Order Details, data sheet 

Technical specifications, conditions of operation 

Product Brochures, Engineering Data Sheets 

Technical specifications, conditions of operation 

Supplier documentation  

Technical documentation for parts supplied by 
subcontractors 

Declaration of conformity  

Conformity with standards, contents of the 
declaration of conformity  

Содержание 2BIC Series

Страница 1: ...Safety and Operation WARNING These instructions should be read thoroughly by all personnel involved with pump operation prior to pump installation operation or maintenance Manual No SRM00100 Rev 02 1...

Страница 2: ...Transportation of Pumps 10 D 2 Storage Spare Parts 10 E Installation Start up 11 E 1 General 11 E 2 Tools 11 E 3 Installation Preheating Start up 11 E 3 1 Lubrication Preparation 11 E 3 2 Preheating C...

Страница 3: ...s Read observe and follow this manual and the other applicable documents especially all safety instructions and warnings A 2 Other Applicable Documents Document Purpose Product Service Manual Detailed...

Страница 4: ...ntially Hazardous Situation Minor Bodily Harm Material Damage Symbol Meaning Safety Warning Take note of all information highlighted by a Safety Warning Sign and follow the instructions to avoid damag...

Страница 5: ...flow with minimum fluid pulsation and low pump noise Fluid flowing through the pump provides lubrication for moving parts B 1 2 CIG General Description The CIG is a positive displacement internal gea...

Страница 6: ...6 B 2 3 CIG Designation B 2 4 2BIC Designation B 3 Labeling B 3 1 CE Nameplate...

Страница 7: ...al knowledge to apply generally accepted safety and operational practices which may not be otherwise covered Every effort was made to prepare the text of this manual so that technical information is c...

Страница 8: ...ssure monitoring devices and sealing apparatus are installed and operation prior to starting the pump CAUTION Do not operate the pump while the valves in the system are closed o Pumps may not be used...

Страница 9: ...valves can be opened or the blockage removed i NOTE Only trained specialized personnel are qualified to perform maintenance which includes but is not limited to o Inspection o Repair o Assembly o Disa...

Страница 10: ...on from hot surfaces and hot liquids must be provided by the operator Take care not to drop the pump Pump weights are clearly and durably marked onto the pump surface Read and consider the weight prio...

Страница 11: ...p housing WARNING On critical or dangerous equipment provide safety and emergency systems to protect personnel and property from injury due to pump malfunction If pumped liquids are flammable toxic co...

Страница 12: ...other cool liquid to the surface If the pump is to be preheated or cooled prior to installation heat or cool the pump to the operating temperature by use of an approved method such as a band heater ba...

Страница 13: ...are available Re adjust the packing follower several times through the running in period until the seal is thoroughly seated and the rate of leakage is stable F Operation Shutdown Restart F 1 Heating...

Страница 14: ...ing power to driver Shut wire or chain and lock all valves in pump inlet outlet piping If applicable shut off any steam or other fluid supply lines to the pump Visually check equipment frequently for...

Страница 15: ...Installation of spare parts should only be performed by trained specialized personnel in conjunction with the appropriate Original Installation Care and Maintenance Instructions H Failure All failures...

Страница 16: ...2018 CIRCOR Pumps North America LLC All rights reserved CIRCOR 1710 Airport Road P O Box 5020 Monroe NC USA 28111 5020 Tel 704 289 6511 Website www circorpt com e mail cc circor com...

Отзывы: