69
D
Checkup
After applying new settings, please go to next URL from Charge Point in
order to check properly connection from the integration chosen:
http://<IP>/services/cpi/log?app=ocpp1.5
If
‘CB boot notification: success’
appears then Charge Point is properly
connected to the back-end.
Otherwise, if the message shown is
‘Registering CB in the CS: failed’
then check following items:
- Backend URL. Case sensitive. Check all the URL is correct.
- Charge Point ID. Case sensitive. Check if the name entered is same as
backend expects to receive.
- Connectivity. Check if modem is power up and connected to the HMI
screen. Ask to the backend provider if any request has been received from
the charge point (BootNotification, StatusNotification or HeartBeat) after
upgrading.
Look especially for the following messages:
Содержание Master-Slave
Страница 1: ...Instruction Manual Master Slave ...
Страница 76: ...74 Master Slave Instruction Manual A window will pop up in order to choose the file then click on upload ...
Страница 87: ...85 Monitoring ...
Страница 90: ...88 Master Slave Instruction Manual 11 ...