background image

Instruction Manual

Master-Slave

Содержание Master-Slave

Страница 1: ...Instruction Manual Master Slave ...

Страница 2: ...s manual can be reproduced copied translated or transmitted in any form or by any means without the prior written permission of the original manufacturer Information provided in this manual is intended to be accurate and reliable However the original manufacturer assumes no responsibility for its use or for any infringements upon the rights of third parties athat may result from its use All other ...

Страница 3: ...gure eVolve So hello Features How to use it Genereal Language Start charging Charge information Special events start charging Stop charging Charge summary Connector status Errors 04 06 08 08 10 11 14 15 17 18 19 20 1 2 3 A B C D E F G H I ...

Страница 4: ...hboard Network Security Time Integrations Services Firmware Charge Point Configuration Configuration Update Teltonika RUT 240 Modem overview Connection status LED SIM card installation Logging in Configuration 22 22 23 24 26 26 32 34 35 36 37 38 39 43 44 44 45 46 47 48 4 A B C 5 A B C D E F G H I 6 A B C D E ...

Страница 5: ... Before starting Configuration Checkup OCPP 1 6 Introduction Before starting License activation Configuration Checkup Monitoring Technical Data Need help 58 58 59 61 69 70 70 71 73 75 83 84 86 88 7 A B C D 8 A B C D E 9 10 11 ...

Страница 6: ... from it with step by step configuration instructions ATTENTION Indicates that the damage to property can occur if appropiate precautions are not taken 1 THE FOLLOWING SYMBOLS ARE USED FOR IMPORTANT SAFETY INFORMATION IN THIS DOCUMENT Complies with IEC 61851 Electric vehicle conductive charging system IEC 61851 1 and IEC 61851 22 Complies with IEC 62196 Plugs socket outlets vehicle couplers and ve...

Страница 7: ...r country Do not make repairs or manipulations with the unit energised Only trained and qualified personnel should have access to electrical parts inside the device Check the installation annually by a qualified technician Remove from service any item that has a fault that could be dangerous for users broken plugs caps that don t close Use only Circontrol supplied spare parts Do not use this produ...

Страница 8: ...mmunication for remote supervision and configuration 4G Modem optional For those places where wired communications are not sufficient Energy metering Integrated meter built is measuring power and energy consumed by the EV during a charge transaction Remote access For supervision and control from everywhere Charge transaction historics Charge Point is capable of storing information about the charge...

Страница 9: ...tion of EV meanwhile is charging Light beacon Three colour led indicates the status of the connectors Energy metering Integrated meter built is measuring power and energy consumed by the EV during a charge transaction Remote access For supervision and control from everywhere Charge transaction historics Charge Point is capable of storing information about the charge transactions ...

Страница 10: ...ime the Charge Point is powered on the system will take around 10 seconds to start up the screen will show next image In the lower right corner the firmware version is shown After 10 seconds the first screen that appears is the screensaver A General ...

Страница 11: ...rd is the option that will allow to start a Charging session or to stop an ongoing Charging session The second option touch the screen is meant to get information about the connectors status and the charging process so as to know the Charge Point availability However a Charging session cannot be started or do any action over the currently charging session unless an authorised identification card i...

Страница 12: ...ge language pressing on the top of the screen over the Flag touch symbol B Language The language can be chosen by tapping on the corresponding flag The availability of the different languages is subject to the firmware version In case of doubt please consult your local supplier ...

Страница 13: ...11 C Start charging Once the identification card is shown it may take a few seconds to authorise the access The HMI informs if the access is granted or not ...

Страница 14: ...time it is possible to tap this button in order to go back to the identification screen Once the connector is chosen instruction screens will appear successively 1 Connect your vehicle and press the Start button At any time is possible to tap this button in order to go back to the previous screen ...

Страница 15: ...13 2 Checking vehicle connection Please wait In a few seconds the charging session will start and the HMI will show the charging process Tap this button in order to go back to the identification screen ...

Страница 16: ...alog process indicator at first moment it is red as the vehicle is charging it will change to green passing before for orange 3 Charge time with status bar charging time elapsed so far 4 House touch button it goes back to the identification screen 5 Additional information instructions current status etc 6 Energy charged energy supplied to the vehicle so far ...

Страница 17: ...e Points could be working under the supervision of a main management system If the user is not authorized the HMI will show the following message Authorization failed the authorization could not be completed due to some communication problem with the Back Office ...

Страница 18: ...16 Master Slave Instruction Manual It is possible that the Charge Session could not be started due to some unexpected reason The HMI will show next screen press Retry button and try again ...

Страница 19: ...dentification card that started the Charging Session the Charge Point will automatically allow to stop the charging Once the charging session is stopped the HMI shows the summary screen Press over the Exit touch button and disconnect the vehicle ...

Страница 20: ...rging session 4 Stop reason It shows why the charging session has been stopped 5 Exit button It has to be pressed in order to finish the charging session After pressing the HMI screen will go back to the identification screen 6 Recharge time total recharging time at the end of the charging session 7 Information button pressing over this button you can get information about the charging session per...

Страница 21: ...arging Session cannot be starded because it is under maintenance or because the Back office has decided to stop it Connector available a Charging Session can be starded Connector out of service a Charging Session cannot be starded due to some error Tap on the Information button in order to get more information about it Connector reserved a Charging Session can only be starded using the IdTag assig...

Страница 22: ...n report about different sort of errors it can be from different parts or devices from it When the Error screen appears the Information touch button has to be pressed in order to see the error message as you can see below Chargepoint 0x0 Plug 0x20000 Socket 0x2000 ...

Страница 23: ...g the whole charge Point E g RFID error Plug Error affecting one plug All sockets are in error state Plug is inoperative Socket One plug may have more than one socket Error can affect one socket and plug still being available Logical levels ...

Страница 24: ... Network topology The Master Charge Point and all the Slave Charge Points must be connected to the same Ethernet Switch before proceeding with the commissioning The Switch Device may be located inside the Master Charge Point as an optional ...

Страница 25: ...exe Can be downloaded for free from Circontrol Expert Area The Ethernet port of the Master Charge Point is located at the bottom left side of the rear part of the HMI screen There is only one Ethernet port on the Slave Charge Point and it is located on the TCP1RS The location of this device may vary depending on the model for more information please contact Circontrol Post Sales Department ...

Страница 26: ...IPSetup 1 Connect the UTP Cable to the Computer running Microsoft Windows at least Windows XP and the Ethernet Switch The Computer and the Charge Point must be in the same network and in the same range 2 Execute IPSetup exe on the Computer ...

Страница 27: ...arge Point see label on the side of the Charge Point IP address Netmask Gateway leave default settings 4 Wait 30 seconds approximately until the process is complete 5 The process will complete when the following message appears by click ing on OK the setup webpage will open ...

Страница 28: ...options To access the setup web page open a web browser and enter the IP address previously configured 5 A Dashboard Overview As a relevant information the Summary shows Firmware version Version of the firmware currently working in the Charge Point MAC Address Identifier of the network card of the Charge Point ...

Страница 29: ...27 Setup Webpage Devices Status As a relevant information the Devices Status shows Device name Name of the devices inside the Charge Point Status OK online NOT OK offline ...

Страница 30: ...ion shown in this section is basically relative to the state of the Control Board of the Charge Point This is necessary for the technical service staff but does not show any information regarding the external connection of the Charge Point or the charging session ...

Страница 31: ...he information shown in this section is regard to the drivers that the Charge Point needs in order to recognize the different devices inside the Charge Point such as the meters the Mode 3 controller the RFID reader ...

Страница 32: ...nformation shown in this section is basically related to the internal behavior of the Charge Point This is necessary for the technical service staff but does not show any information regarding the external connection of the Charge Point or the charging session ...

Страница 33: ...ion are automatically produced by the Charge Point it is a detailed list of the charging sessions system performance or user activities This logs are created since Charge Point is powered On Even if Charge Point is restarted the logs are saved ...

Страница 34: ...32 Master Slave Instruction Manual B Network This section provides basic configuration of the network parameters Clicking over the Network tab next image will appear ...

Страница 35: ...elect this option only when SIERRA Wireless RAVEN XE cellular router is connected to the charge point SIERRA Wireless AirLink LS300 select this option only when SIERRA Wireless AirLink LS300 cellular router is connected to the charge point Circutor SGE 3G GPRS Select this option only when Circutor SGE 3G GPRS cellular router is connected to the charge point Teltonika RUT240 LTE Select this option ...

Страница 36: ... the Setup Webpage All parameters are disabled from factory settings Value Description Authentication ON authentication enableb OFF authentication disabled User Name Username and Password authentication for Setup web page Password Repeat password Do not forget the credentials There is no way to restart the Charge Point to default factory settings ...

Страница 37: ...me for the Charge Point Value Description Time Zone Select the regional time for the Charge Point according to the location Time Current date and time of the Charge Point Primary NTP Server Synchronize the time through internet automatically Secondary NTP Server ...

Страница 38: ...ction allows to enable and disable OCPP service of the Charge Point Both OCPP 1 5 and OCPP 1 6 are available on the last firmware version For more information about the parameters and configuration please refer to OCPP 1 5 or OCPP 1 6 chapters of this manual ...

Страница 39: ...t as well as setting a password Value Description Grid Test The Charge Point makes a calibration test on the HMI screen Default language It is possible to choose the default language for the HMI screen Authentication It can be set an authentication to avoid changes in this page ...

Страница 40: ...firmware can be upgraded remotely by clicking on the Select File button A window will pop up in order to choose the file then click on upload To obtain the latest firmware version please contact CIRCONTROL Post Sales Department More information in Need help chapter ...

Страница 41: ...thout exceeding the limit configured NO the Charge Point does not take in consideration any limit giving the maximum power for each connector Total Consumption Maximum current value offered by the Charge Point that shares between the ongoing Charge Transactions NOTE This value must be equal or higher than 6A multiplied by the number of outlets Meaning that it must be equal or higher than the sum o...

Страница 42: ...ster Slave Instruction Manual A new menu will show up in order to add new Slave Charge Points The Master Charge Point is able to manage numerous Slave Charge Points in order to add them click on Add charger ...

Страница 43: ...cking the Save button all the configuration inside the Slave chargers configuration is applied Before doing so make sure all fields are properly filled More fields are shown when selecting a Slave charger model ...

Страница 44: ...address of the Slave Charge Point MAC Address MAC address of the Slave Charge Point Perform IP address assigment YES when clicking the Save button on the bottom of the web page the desired IP address is assigned to the Slave Charge Point with the MAC address specified NO when clicking the Save button on the bottom of the web page the Slave Charge Point with the IP address specified is added to the...

Страница 45: ...ect File button Intended ONLY for Service Staff to restore the Charge Point to default factory settings A window will pop up in order to choose the file then click on upload To obtain the appropriate configuration file please contact CIRCONTROL Post Sales Department More information in Need help chapter ...

Страница 46: ...ly view or manage the Charge Point status RUT240 is part of the RUT2xx series of compact mobile routers with high speed wireless and Ethernet connections 1 LAN Ethernet port 7 Signal strength indication LEDs 2 WAN Ethernet port 8 SIM card holder 3 LAN Led indicator 9 WiFi antenna connector 4 WAN Led indicator 10 Reset button 5 Power connector 11 LTE antenna connectors 6 Power LED ...

Страница 47: ...linking every 1 sec no SIM or bad PIN 3 2G 3G LED s blinking every 1 sec connected 2G 3G but no data session established 4 Blinking from 2G LED to 3G LED repeatedly SIM holder not inserted 5 2G 3G LED turned on connected 2G 3G with data session 6 2G 3G LED blinking rapidly connected 2G 3G with data session and data is being transferred B Connection status LED ...

Страница 48: ...sert the SIM card 4 Push in the SIM holder After installing the SIM card check out that the 4G antenna mobile WiFi antenna and the power connector are properly attached Insert SIM card which was given by your ISP Internet Service Provider Correct SIM card orientation is shown in the picture SIM card NOT provided by CIRCONTROL ...

Страница 49: ... or Ethernet 1 Using a Computer look for a WiFi access point named RUT240_ xxxxxxxxxxxx and connect on it no password needed If connecting via Ethernet skip this step 2 Open a web browser and type http 192 168 1 1 3 Use the following parameters when prompted for authentication User name admim Password admin01 ...

Страница 50: ...rt after logging in It is necessary to complete Configuration Wizard to setup the modem correctly Go to Status Network Mobile and pay attention to Sim card state field it has to be Ready When using OCPP do not change the default password Charge Point needs to obtain a public IP address ...

Страница 51: ...k on the Save button If the SIM provider requires any authentication PAP or CHAP select it on Authentication method field and introduce a password and username Before doing any customisation over the modem configuration ask Circontrol Post Sales Department in order to get the Teltonika modem manual ...

Страница 52: ...er Slave Instruction Manual Go to Status Network Mobile If the connection has been done properly Data connection state has to be Connected Go to Status Network WAN The modem must have found a public IP address ...

Страница 53: ...automatic IP address and MAC number for both the Computer connected and the Charge Point If the modem has not detected the automatic IP address switch off the Charge Point wait for 10 seconds and switch it on again Connect the Computer to the access point named RUT240_xxxxxxxxxxxx and try again ...

Страница 54: ...ing information Hostname It can be written the name wanted for the Charge Point MAC address It will be the MAC number found on the label behind the HMI screen IP address 192 168 1 50 After filling the fields click on the Save button Switch off the Charge Point wait for 10 seconds and switch it on again ...

Страница 55: ...Status Network LAN DHCP Leases Confirm that the information previously entered has been successfully saved Hostname the name given to Charge Point MAC address the MAC of the Charge Point IP address 192 168 1 50 ...

Страница 56: ...ts as in the table below Name Protocol External port S Internal IP Internal port S 80 TCP 80 192 168 1 50 80 8080 TCP 8080 192 168 1 50 8080 50000 TCP 50000 192 168 1 50 50000 9191 TCP 9191 192 168 1 1 80 After noting down the ports click on Save button and check that all of them have been successfully introduced ...

Страница 57: ...55 Go to Network Firewall Traffic Rules Click on Save button Look for Enable_HTTP_WAN and Enable_HTTPS_WAN fields and enable them ...

Страница 58: ...lave Instruction Manual To end the modem configuration it is necessary to reboot it Go to System Reboot and click on the Reboot button Go to System Access Control Safety Uncheck WebUI Access Secure as shown on the ...

Страница 59: ...osen and DHCP is ON at Charge Point s setup webpage Make sure that the Computer is still connected to the Charge point via WiFi open a web browser and type 192 168 1 50 next screen will appear DCHP ON Address Type Teltonika RUT240 LTE Click over the Disk symbol button in order to save ...

Страница 60: ...OCPP is to offer a uniform solution for the communication between Charge Point and a Central System With this open protocol it is possible to connect any Central System with any Charge Point regardless of the vendor Follow next steps in order to configure OCPP 1 5 in the Circontrol Charge Points ...

Страница 61: ...address in order to send it later to the backend Different values can be selected in the Address Type section Choose the option selected under Address Type according to your network topology Check following steps in order to ensure the correct function of OCPP 1 5 When done please do not forget to save changes using Save button in the upper right bar ...

Страница 62: ...same time Go back to setup web page and click on the Integrations tab choose the option selected under Available integrations according to your backend policies as shown in the picture NOTE Charge Point is working as stand alone if none option is selected All ID cards are authorized to start stop a new charge transaction and no requests are sent to the backend ...

Страница 63: ...tton as shown in the picture New webpage is opened to show OCPP Settings It can also be accessed directly typing http IP 8080 html setup html First time is running the integration selected on the Charge Point it starts as configuration mode and all fields are empty Settings are always stored even when the Charge Point is powered off or even the integration is disabled stopped ...

Страница 64: ... Description ID Charge Point identifier Public IP timeout Maximum waiting time to obtain the public IP address of the 3G modem OCPP Internal port Incoming listening port for remote request internal OCPP Public port Incoming listening port for remote request public Client Certificate Provided by the Central System Protocol If HTTPS is selected make sure to have CS Server CA certificate Authenticati...

Страница 65: ... Check Central System URL according to the backend policies please contact to the Central System to get the configuration parameters Value Description ID Tag Endianness Storage type for system data Host URL URL address of the central system Authentication It can be set an authentication for avoinding changes in this page ...

Страница 66: ...PP Settings tab Check OCPP Settings according to the backend policies please contact to the Central System to get the configuration parameters Before making any changes read following table and set each option according to your backend provider ...

Страница 67: ...uthorize always in offline mode Yes If user is not present locally in the local white list and charge point cannot ask to the backend user is allowed to start a new charge transaction No If user is not present locally in the local white list and charge point cannot ask to the backend the user is not allowed to start a new charge transaction Retry after CS internal error Yes Enabled If StatusNotifi...

Страница 68: ...his function Energy for Start Stop transaction Partial Consumed value of energy by the vehicle sent between start and stop Total actual count of the total accumulated energy meter sent between start and stop Energy for MeterValues Partial Sends partial energy consumption while vehicle is charging Total sends the actual count of the total accumulated energy meter Stop charge if StartTrans action re...

Страница 69: ...ing a new remote charge transaction request No Charge point starts a new remote charge transaction without authorization request Active Power in MeterValues Yes Send power Power Active Import and energy Energy Active Import Register consumed by the vehicle within meter values requests No Only energy consumed is sent within meter values request Heartbeat interval Heartbeat send interval in seconds ...

Страница 70: ...e Instruction Manual Once done please do not forget to save changes using Save button in the Please wait until the new configuration is being applied to the Charge Point A message is displayed informing the progress ...

Страница 71: ... the message shown is Registering CB in the CS failed then check following items Backend URL Case sensitive Check all the URL is correct Charge Point ID Case sensitive Check if the name entered is same as backend expects to receive Connectivity Check if modem is power up and connected to the HMI screen Ask to the backend provider if any request has been received from the charge point BootNotificat...

Страница 72: ...OCPP is to offer a uniform solution for the communication between Charge Point and a Central System With this open protocol it is possible to connect any Central System with any Charge Point regardless of the vendor Follow next steps in order to configure OCPP 1 6 in the Circontrol Charge Points ...

Страница 73: ...address in order to send it later to the backend Different values can be selected in the Address Type section Choose the option selected under Address Type according to your network topology When done please do not forget to save changes using Save button in the upper right bar Check following steps in order to ensure the correct function of OCPP 1 6 ...

Страница 74: ...ck on the Integrations tab choose the option selected under Available integrations according to your backend policies as shown in the picture NOTE Charge Point is working as stand alone if none option is selected All ID cards are authorized to start stop a new charge transaction and no requests are sent to the backend License required refer to the next chapter for more information about the activa...

Страница 75: ...does not have the license applied the following message pops up To obtain the license file please contact CIRCONTROL Post Sales Department More information in Need help chapter The license can be applied by clicking on the Select File button C ...

Страница 76: ...74 Master Slave Instruction Manual A window will pop up in order to choose the file then click on upload ...

Страница 77: ...ton as shown in the picture New tabs are opened to show OCPP Settings It can also be accessed directly typing http IP 8080 html setup html First time is running the integration selected on the Charge Point it starts as configuration mode and all fields are empty Settings are always stored even when the Charge Point is powered off or even the integration is disabled stopped D ...

Страница 78: ... Instruction Manual On the OCPP webpage go to Charge Box tab Check Charge Box Identity and the incoming ports according to the backend policies please contact to the Central System to get the configuration parameters ...

Страница 79: ...te and time Disabled NOTE Date and Time is sent from backend on each heartbeat response Energy for Start Stop transaction Partial Consumed value of energy by the vehicle sent between start and stop Total actual count of the total accumulated energy meter sent between start and stop Energy for MeterValues Partial Sends partial energy consumption while vehicle is charging Total sends the actual coun...

Страница 80: ...e the central system is hosted to notify all the requests Check Central System URL according to the backend policies please contact to the Central System to get the configuration parameters Value Description ID Tag Endianness Storage type for system data Host URL URL address of the central system ...

Страница 81: ...79 Go to OCPP Settings tab Check OCPP Settings according to the backend policies please contact to the Central System to get the configuration parameters ...

Страница 82: ...rized identifiers without waiting for the Central System authorization NO Charge Point requests authorization for presented identifiers to the Central System Allow offline Tx for unknown Id YES during offline period unknown identifiers are allowed to start charging NO during offline period unknown identifiers are NOT allowed to start charging Local authorize off line YES during offline period loca...

Страница 83: ...er to unlock the connector Supported profiles List of supported profiles on the Charge Point NOTE this field is for information purposes it cannot be modified Maximum number of configuration Keys Maximum number of requested configuration keys that can be requested by the Central System NOTE this field is for information purposes it cannot be modified Heartbeat interval Number of seconds between He...

Страница 84: ...led No Local Authorization List disabled Local auth list max length Maximum size of the Local Authorization List a list of identifiers that can be synchronized with the Central System It can be viewed accessing to the following URL http IP 8080 services cmd dump_localList xml NOTE this field is for information purposes it cannot be modified Send local list max length Maximum number of identificati...

Страница 85: ... Point is properly connected to the back end Otherwise if the message shown is Registering CB in the CS failed then check following items Backend URL Case sensitive Check all the URL is correct Charge Point ID Case sensitive Check if the name entered is same as backend expects to receive Connectivity Check if modem is power up and connected to the HMI screen Ask to the backend provider if any requ...

Страница 86: ...y Circontrol PS Support staff or you can download it from Circontrol Expert Area Webpage NOTE Java software needs to be installed on your computer in order to run the client software please download last version from www java com In remote connections where is required communicate via 3G 4G data with the Charge point in order to monitor its parameters it should be noted that there will be a HIGH c...

Страница 87: ...85 Monitoring ...

Страница 88: ... x 290 mm Connectors optional Shutter Type 2 Socket Type 1 Cable Type 2 Cable ELECTRICAL Power supply 1P N PE 3P N PE Input voltage 230VAC 10 400VAC 10 Frequency 50Hz 60Hz Meter MID Class 1 EN50470 3 ENVIRONMENTAL CONDITIONS Operating temperature 5ºC to 45ºC Operating temperature with Low Temperature Kit optional 30ºC to 45ºC Storage temperature 20ºC to 60ºC Operating humidity 5 to 95 Non condensi...

Страница 89: ...ility to your local supplier This is the minimun cable section recommended for the maximum AC input current the final section must be calculated by a qualified technician taking into account the specific conditions of installation M L MASTER SPECIFICATIONS Display Touch screen 8 RFID reader ISO IEC 14443A B MIFARE Classic Desfire EV1 ISO 18092 ECMA 340 NFC 13 56MHz Ethernet 10 100BaseTX TCP IP Cel...

Страница 90: ...88 Master Slave Instruction Manual 11 ...

Страница 91: ...89 Need help In case of any query or need further information please contact our Post Sales Department 34 937 362 940 34 937 362 941 ps support circontrol com circontrol com ...

Страница 92: ...r Slave Installation Manual CIRCONTROL MASTER SLAVE INSTRUCTION MANUAL A comprehensive guide on how to use and configure your Master Slave V1 0 September edition 2018 CIRCONTROL S A ALL RIGHTS RESERVED R100 ...

Отзывы: