CIRCONTROL, S.A.
– Innovació, 3 – 08232 – Viladecavalls (Barcelona)
Tel.: +34 937 362 940
– Fax: +34 937 362 941
9
Web: www.circontrol.com
– E-mail:
INSTALLATION MANUAL
–CCL-PT3 SMART & CCL-PT3 SMART 3G–
6.3
FOUNDATION PROCEDURE
STEP
ACTION
1
The
four “L”
threaded bars
must be placed and cemented underground in
the foundation place as shows bellow figure.
Drawing foundation dimensions are minimum recommended to fix post
to the ground, please consider hardness ground conditions.