Cincinnati KS-70 Скачать руководство пользователя страница 8

4600 N. Mason Montgomery Road  

·

  

Mason, OH 45040

 

800

-

677

-

0076  

·

  Fax: 513

-

923

-

5694

www.CinInd.com  

·

  [email protected]

 

A Subsidiary of The Armor Group, Inc.

 

Version 1.04

 

October 2014

 

herein  specified;  provided  and  upon  the  express 
condition  that  the  Equipment  is  used  in  the  manner 
directed and exclusively for the purpose for which it is 
sold  without  any  changes  and  installed  or  used  in 
compliance with Manufacturer's plans and instructions, 
and upon further express condition that Purchaser shall 
immediately after service of the writ in any such suit at 
law  or  in  equity  notify  Manufacturer  in  writing  of  the 
commencement  of  such  suit,  giving  the  names  of  the 
parties  and  the  title  of  the  court,  and  shall  permit 
Manufacturer to defend same by its own counsel and at 
its  own  expense  and  to  have  exclusive  control  and 
management of the defense, and that  Purchaser shall 
give  Manufacturer  all  needed  information,  assistance 
and  authority  to  enable  Manufacturer  to  defend  such 
suit.

 

INDEMNIFICATION

 

-

  Purchaser  agrees  to  indemnify 

Manufacturer,  and  hold  Manufacturer  harmless  from, 
all  costs  and  expenses  incurred  by  Manufacturer, 
including,  without  limitation,  costs  of  investigation, 
attorneys'  fees,  and  amounts  paid  in  settlement  or 
satisfaction  of  claims,  proceedings,  or  judgments,  in 
connection  with  all  claims  and  proceedings  against 
Manufacturer based upon claimed defects in design in 
any  item  or  items  manufactured  for  Purchaser  by 
Manufacturer 

to 

Purchaser's 

design 

and/or 

specifications.

 

CANCELLATIONS

 

-

  In  the  event  Purchaser  should 

request  cancellation  of  this  contract,  or  part  of  it, 
Purchaser  agrees  to  pay  Manufacturer  the  contract 
price on any articles which are delivered and ready for 
delivery  on  the  date  when  such  cancellation  becomes 
effective.    As  to  all  such  articles  not  so  delivered, 
Purchaser shall have the option:

 

1)

To  require  completion  and  to  pay  the  contract

price thereof; or

2)

To 

reimburse 

Manufacturer 

for 

actual

expenditures  made  with  respect  to  the  articles  which
are  uncompleted;  to  reimburse  Manufacturer  for
commitments incurred with respect to the uncompleted
articles of the contract; and to pay Manufacturer for the
anticipated profit of the entire contract.

Manufacturer  may,  by  written  notice  to  Purchaser  and 
without  any  liability,  cancel  Purchaser’s  contract  if 

Purchaser  (i)  fails  to  perform  any  of  the  terms  and 
conditions hereof and does not cure such failure within 
a period of 10 days after receipt of written notice from 
Manufacturer 

specifying 

such 

failure: 

(ii) 

in 

Manufacturer’s  opinion  has  not  established  or 
maintained credit to meet promptly the payment terms 
imposed  by  Manufacturer:  (iii)  becomes  insolvent, 
makes an assignment in favor of creditors, or becomes 
subject  to  any  bankruptcy,  dissolution,  or  similar 
proceedings;  or  (iv)  is  merged  into,  or  all  or  a 
substantial  part  of  its  assets  are  sold  to,  another 
company. 

 

FORCE

 

MAJEURE

 

-

    Delays  by  Manufacturer  or  by 

Purchaser  in the  performance of this contract shall  be 
excused  whenever  Manufacturer  or  the  supplying 
manufacturer is prevented from producing of delivering, 
or  Purchaser  from  receiving  or  using  the  above 
material,  by  strikes,  differences  with  workmen,  fires, 
accidents, delays or difficulties in transportation acts of 
God or the  public enemy,  or other causes beyond the 
reasonable control of  Purchaser or of Manufacturer or 
of  the  supplying  manufacturer,  as  well  as  acts  or 
demands of the government in times of war or national 
emergency.  Any  such  delayed  performance,  however, 
shall not in any way invalidate this contract or any part 
thereof.

 

JURISDICTION

 

-

  Purchaser  irrevocably  consents  and 

voluntarily submits to personal jurisdiction of the courts 
located in Warren County and the United States District 
Court  for  the  Southern  District  of  Ohio,  Western 
Division  in  any  proceeding  arising  out  of  or  relating  to 
the  contract  and  agrees  that  all  claims  raised  in  such 
proceeding  may  be  heard  and  determined  in  such 
court.  

 

GOVERNING

 

LAW

  –  The  contract  shall  be  governed 

by and construed  in accordance  with the  internal laws 
of the State of Ohio, United States of America, without 
regard  for  its  choice  and  or  conflict  of  laws  provisions 
and  without  regard  to  the  United  Nations  Convention 
on Contracts for the International Sale of Goods.   

 

Purchase  Orders  and/or  contracts  may  only  be 
accepted  in  writing  by  an  authorized  representative  of 
Manufacturer  from  the  Mason  Office  of  Armor  Metal 
Group.

 

Page 04 

KS-70 R

ACK

 W

ASHER

 

W

ARRANTY

 

AND

 N

OTICE

 

Содержание KS-70

Страница 1: ...KS 70 RACK WASHER Version 1 04 October 2014 ...

Страница 2: ...diary of The Armor Group Inc Version 1 04 October 2014 This ALVEY WASHING EQUIPMENT machine was installed by lead installer on the day of month day year Serial Customer PO Manufacturer SO For parts and services call ARMOR AFTERMARKET at 1 800 725 9957 or email partsandservice armoraftermarket com KS 70 RACK WASHER ...

Страница 3: ...n order replacement 2 We are entitled to original equipment manufacturer discounts which are passed on to our customers 3 It is our primary responsibility to serve you in a timely and professional manner A suggested spare parts list for your machine is included in the CD we are providing your company This CD has been created to assist you in learning about and using your new machine The program wi...

Страница 4: ...r 2014 Section Title Page I Warranty and Notice 1 II General Description 3 III Assembly of Washer and Auxiliary Equipment 6 IV Service Connections 8 V Start Up 9 VI Sequence of Operations 10 VII Shut Down 11 VIII Service and Maintenance 12 IX Trouble Shooting Guide 13 X Recommended Spare Parts 16 XI Illustrations See Attached KS 70 RACK WASHER TABLE OF CONTENTS ...

Страница 5: ...the agreed terms If Manufacturer gives Purchaser possession before final payment is made it is hereby mutually agreed that a The title and the right of possession of the Equipment shall transfer to the Purchaser upon shipment provided however Manufacturer shall retain a purchase money security interest lien on each piece of Equipment including without limitation any accessories to such Equipment p...

Страница 6: ...ufacturer b EXCEPT AS SPECIFICALLY PROVIDED IN a ABOVE MANUFACTURER MAKES NO WARRANTY EXPRESS OR IMPLIED RELATING TO THE EQUIPMENT ITS MERCHANTABILITY OR FITNESS FOR ANY PARTICULAR PURPOSE c Manufacture does not provide a separate warranty for parts or components not manufactured by Manufacturer Equipment parts and accessories made by other manufacturers are warranted only to the extent of the ori...

Страница 7: ...ufacturer b EXCEPT AS SPECIFICALLY PROVIDED IN a ABOVE MANUFACTURER MAKES NO WARRANTY EXPRESS OR IMPLIED RELATING TO THE EQUIPMENT ITS MERCHANTABILITY OR FITNESS FOR ANY PARTICULAR PURPOSE c Manufacture does not provide a separate warranty for parts or components not manufactured by Manufacturer Equipment parts and accessories made by other manufacturers are warranted only to the extent of the ori...

Страница 8: ...ay Manufacturer for the anticipated profit of the entire contract Manufacturer may by written notice to Purchaser and without any liability cancel Purchaser s contract if Purchaser i fails to perform any of the terms and conditions hereof and does not cure such failure within a period of 10 days after receipt of written notice from Manufacturer specifying such failure ii in Manufacturer s opinion ...

Страница 9: ...ects work to a recirculating high pressure spray wash through two rotating spray arms followed by a fresh water rinse The wash tank is manually filled with cold or hot water which is heated by one of the optional systems a steam injector steam heated coils electric immersion heaters or a natural gas or propane burner The wash water temperature is thermostatically controlled AVAILABLE OPTIONS Rinse...

Страница 10: ...ted confirm that there is sufficient space for the machine loading ramp Receiving the Machine The machine will be received disassembled The wash chamber and attached equipment have been removed from the tank in preparation for shipment Panel flanges and tank is match marked before disassembly of wash chamber Wiring is disconnected at junction boxes with leads marked piping is disconnected at union...

Страница 11: ...hten only those bolts holding front assembly to the tank 7 Align next adjacent panels and tighten bolts attaching them to the front panel assembly Start at the bottom Repeat for each successive Interior Piping 1 Attach interior rinse piping to rinse manifolds at unions and extend threaded nipple through chamber wall Secure with pipe nuts and rubber and metal washers Bolt rinse manifold brackets to...

Страница 12: ... assembly with clips provided 3 Steam booster heater option Attach water inlet steam inlet and condensate piping assemblies to booster heater Attach rinse booster solenoid coil to steam valve Attach piping assembly between booster and external rinse manifold 4 Electric and gas booster heater option Attach piping assembly between booster and external rinse manifold 5 Verify that all rinse water and...

Страница 13: ...de diameter burner exhaust tube The stack should have no horizontal run stack sections should be lapped in the direction of flow It may be advisable to install damper in exhaust stack to control draft See sketch When optional draft inducer is furnished enough flexible conduit is included to allow inducer to be mounted in stack within 3 from top of washer VENTILATION Use 7 9 16 inside diameter wate...

Страница 14: ...ER FILL button on the control panel 1 Verify that tank is filled Low level cutoff float provided with gas and electric heat will prevent tank heat from being activated when water is low 2 Set desired wash temperature 140 160 F 3 Turn on power to washer at disconnect switch 4 Steam Heat Open manual steam valve turn control panel heat switch to ON 5 Electric Heat Turn control panel HEAT switch to on...

Страница 15: ...uminum Use of an automatic detergent dispenser is recommended To insure economical use of the compounds sensing probes must be kept clean of any foreign matter If in powder form pour detergent into wash tank close door and run wash cycle until compound has been dissolved Avoid rinse cycle to prevent unnecessary dilution Consult chemical supplier for equipment recommendations Detergent Cont Note Se...

Страница 16: ...light medium or heavy soil position depending soil conditions 4 Push the green Cycle Start Button to begin wash cycle The red In Cycle Indicator will light and stay lit until the cycle is complete 5 Unload washer after In Cycle indicator goes off and wash cycle ends Detergent When the solution reaches operating temperature add the proper amount of cleaning compound at the rate recommended by your ...

Страница 17: ...tely 3 Remove the filter and pump protection screens flush tank and inside walls with water Clean sludge and scale from the heating system and float switches 4 Prepare for next start up Fill wash tank and add detergent Run wash pump through 2 minute cycle to flush out piping and moving parts The door should be left partially open to help eliminate odors 5 Turn off power at disconnect switch Page 1...

Страница 18: ...n bearings should be greased at regular intervals See fan operating and maintenance instructions included with this manual OPTIONAL RINSE WATER BOOSTER HEATERS The booster heater raises the water temperature to meet sanitation requirements for rinsing 180 195 F See Sec V for required services Each booster has been designed and selected to operate on specific pressures temperatures and volumes Oper...

Страница 19: ...n Worn impeller Worn wear ring Bent shaft Clogged impeller PROBLEM DIAGNOSIS Motor overheating Low voltage High current draw missing spray nozzles Faulty motor or motor cooling fan Motor running backwards Motor vibration Bent shaft Worn bearings Blown fuse on transformer secondary Motor will not start Overload has dropped out Faulty door switch door not fully closed Faulty programmable relay Wash ...

Страница 20: ... vapor Water temperature too high Water pressure flow too high Rinse temperature too low Inlet water temperature too low does not match design conditions Gas Electric booster temperature controller improperly adjusted Steam Booster low steam pressure Steam Booster clogged strainer Steam Booster back pressure in condensate line Steam Booster faulty steam trap Rinse Exhaust Fan Motor PROBLEM DIAGNOS...

Страница 21: ...y temperature controller Faulty thermocouple Faulty igniter igniter module or plug See Burner manual for more Faulty low level float switch Shuts off periodically Loss of gas Low High Pressure Improper adjustment of complete unit Negative air pressure Fire will not enter tube Negative air pressure draft inducer required Overheats Temperature controller set too high Faulty temperature controller Lo...

Страница 22: ... CINCINNATI INDUSTRIALMACHINERY ISO 9001 Quality ...

Отзывы: