Selecting a Location
When selecting the location to install your Alvey KS
-
70 Rack washer, review the dimension sheets and
consider access to the utility requirements.
Determine the minimum distance from outside wall or
roof to optimize ventilation. Ensure there is ample
floor space for maintenance and for storage of
cleaned and soiled work. Finally, confirm whether
the machine is pit or floor mounted. If pit mounted,
ensure that the pit for the tank has been constructed.
If floor mounted, confirm that there is sufficient space
for the machine loading ramp.
Receiving the Machine
The machine will be received disassembled. The
wash chamber and attached equipment have been
removed from the tank in preparation for shipment.
Panel flanges and tank is match marked before
disassembly
of
wash
chamber.
Wiring
is
disconnected at junction boxes with leads marked;
piping is disconnected at unions. Solenoid coils are
slipped off valves and remain attached to conduit
assemblies. Mounting hardware is left attached to
studs on cabinet panels. An assembly kit contains an
adequate length of sealing strip, tubes of silicone
caulk, and sufficient hardware to secure chamber
panels.
Examine equipment for agreement with packing slip
and dimension sheet. Notify factory immediately
concerning any shortages or shipping damage.