13
1. Place material pump in neutral (a)
2. Remove sealing tip and return wand to access port (b).
3. Pin wand trigger and set handle forward (c).
4. Close tank maintenance valve (d).
5. Connect air hose and open air cleanout valve (e).
6. Allow air to blow freely through sealing hose.
7. Move wand handle back and let air blow into tank (c).
8. Open Tank outlet valve momentarily, then close (d).
9. Shut air hose off at compressor, close air cleanout valve and dis-
connect hose (e).
10.
Turn Key off and proceed with normal machine shut-down.
(a)
(b)
(c)
(d)
(e)
Cleanout Procedure (Optional Air Cleanout)
Содержание Magma 150
Страница 7: ...7 Controls and Their Functions 10 9 ...
Страница 20: ...20 Parts Section ...
Страница 21: ...21 Complete Wiring Diagram ...
Страница 22: ...22 Wiring Diagrams Engine Harness ...
Страница 23: ...23 Wiring Diagram Switch Plate ...
Страница 24: ...24 Wiring Diagrams Temperature Control Panel ...
Страница 25: ...25 Wiring Diagrams Relay Panel ...
Страница 26: ...26 Wiring Diagrams Main Supply Harness ...
Страница 27: ...27 Wiring Diagrams Burner ...
Страница 28: ...28 Hydraulic Schematic For Compressor Hydraulics see Supplement manual ...
Страница 33: ...33 Material Plumbing Components ...
Страница 34: ...34 Material Pump Parts List For Reference Only We do not stock rebuild parts 120803 20 GPM 154151 30 GPM ...
Страница 35: ...35 Material Pump Parts List For Reference Only We do not stock rebuild parts ...
Страница 43: ...43 Miscellaneous Parts ...
Страница 46: ...46 NOTES ...
Страница 47: ...47 NOTES ...
Страница 48: ...48 2601 Niagara Lane Plymouth MN 55447 763 557 1982 800 328 3874 Fax 763 557 1971 ...