12
Cleanout Procedure
1. SETUP:
A) Place wand in port.
B) Pin wand trigger and set handle for-
ward.
C) Place toggle switch with guard in
down position.
D) Set pump control switch to
reverse (R).
D) Set flow to “9”
Hose Clean-out:
Let pump run in reverse for 2 minutes.
Pump Clean-out:
Unpin wand trigger.
Continue running pump in reverse for 2 minutes.
Shut down:
Shut Engine off by turning key to “0”
Set all control switches up (leave toggle switch with guard in
down position).
Move Boom to travel position and
lock
.
Store wand
Contact material supplier for information on
how to flush out non-reheatable materials.
Содержание Magma 150
Страница 7: ...7 Controls and Their Functions 10 9 ...
Страница 20: ...20 Parts Section ...
Страница 21: ...21 Complete Wiring Diagram ...
Страница 22: ...22 Wiring Diagrams Engine Harness ...
Страница 23: ...23 Wiring Diagram Switch Plate ...
Страница 24: ...24 Wiring Diagrams Temperature Control Panel ...
Страница 25: ...25 Wiring Diagrams Relay Panel ...
Страница 26: ...26 Wiring Diagrams Main Supply Harness ...
Страница 27: ...27 Wiring Diagrams Burner ...
Страница 28: ...28 Hydraulic Schematic For Compressor Hydraulics see Supplement manual ...
Страница 33: ...33 Material Plumbing Components ...
Страница 34: ...34 Material Pump Parts List For Reference Only We do not stock rebuild parts 120803 20 GPM 154151 30 GPM ...
Страница 35: ...35 Material Pump Parts List For Reference Only We do not stock rebuild parts ...
Страница 43: ...43 Miscellaneous Parts ...
Страница 46: ...46 NOTES ...
Страница 47: ...47 NOTES ...
Страница 48: ...48 2601 Niagara Lane Plymouth MN 55447 763 557 1982 800 328 3874 Fax 763 557 1971 ...