12
Installing the X2
Prior to Installation
1) Measure the distance from the truck bed to the highest point of the drivers side.
This will be the minimum clearance required for the boom column.
TIP: Use a 4 foot level to increase accuracy of measurement.
2) If the required clearance is greater than
40”
the boom column has to be raised to
the correct height.
NOTICE
: If the required clearance is above
55”
the X2 can not be installed on
that vehicle.
Raising the Boom Column
1) Secure both the boom and boom
column with a lifting straps attached to
an overhead lifting device.
2) Locate and mark the new holes. To
get the adjustment distance; subtract
40”
from the required clearance.
Measure upward from the bolts holding
the column in place. Select the holes
just past the measurement to give you
extra clearance.
Example: If the measured clearance
height is
49.75”
after subtracting
40”
you end up with
9.75”.
You would
select the holes at the
12”
mark not
the
9”
mark.
3) Remove the 4 bolts holding the boom
column in place.
4) Remove the hose guiding clamp above
the loop.
5) Slowly raise the boom up to the
corresponding holes.
NOTICE
: the boom column with
the boom attached has an awkward
center of gravity and care must be
taken to prevent it from binding.
6) Align the holes and bolt the column
back into place.
7) Place the air hose back into the clamp
and tighten.
Содержание 301-000-000
Страница 34: ...34 Notes ...
Страница 35: ...35 ...
Страница 36: ...2601 Niagara Lane Plymouth MN 55447 763 557 1982 800 328 3874 Fax 763 557 1971 ...