
TRANSTIG 170Pi
Manual 0-5242
6-7
TROUBLESHOOTING
6.08 Preliminary Check of the Main Inverter PCB
Art # A-11814
Figure 6-4: Preliminary Check of the Main Inverter PCB
IGBT Testing
Multimeter Lead Placement
Diode Voltage
IGBT V8 & V8-1
Positive meter lead to TP 3
Negative meter lead to TP 4
0.2 – 0.8 VDC
IGBT T1 & T2
Positive meter lead to TP 5
Negative meter lead to TP 6
0.2 – 0.8 VDC
IGBT T4 & T5
Positive meter lead to TP 7
Negative meter lead to TP 8
0.2 – 0.8 VDC
Table 6-4: IGBT’s, Multimeter set to measure Diode Voltage
IGBT Testing
Multimeter Lead Placement
Ohms
IGBT V8 & V8-1
Positive meter lead to TP 4
Negative meter lead to TP 3
>150 Ω
IGBT T1 & T2
Positive meter lead to TP 6
Negative meter lead to TP 5
>150 Ω
IGBT T4 & T5
Positive meter lead to TP 8
Negative meter lead to TP 7
>150 Ω
Table 6-5: IGBT’s, Multimeter set to measure ohms (Ω)
Inrush Resistor
Multimeter Lead Placement
Ohms
Resistor
Positive meter lead to TP 9
Negative meter lead to TP 10
4 Ω
Table 6-6: Inrush PTC, Multimeter set to measure ohms (Ω)
Содержание 170Oi
Страница 6: ......
Страница 16: ...TRANSTIG 170Pi GENERAL INFORMATION 1 10 Manual 0 5242 Notes ...
Страница 20: ...TRANSTIG 170Pi INTRODUCTION 2 4 Manual 0 5242 Notes ...
Страница 26: ...TRANSTIG 170Pi INSTALLATION 3 6 Manual 0 5242 Notes ...
Страница 44: ...TRANSTIG 170Pi OPERATION 4 18 Manual 0 5242 Notes ...
Страница 46: ...TRANSTIG 170Pi INTRODUCTION 5 2 Manual 0 5242 Notes ...
Страница 66: ...TRANSTIG 170Pi TROUBLESHOOTING 6 20 Manual 0 5242 Notes ...
Страница 80: ...TRANSTIG 170Pi ASSEMBLY PROCEDURE 8 6 Manual 0 5242 Notes ...
Страница 84: ...TRANSTIG 170Pi KEY SPARE PARTS 9 4 Manual 0 5242 Notes ...