The  manufacturer  recommends  application  of  the  chimney  systems  which  are  resistant  to  condensate 

soaking-through. The chimney should be made of acid-resistant materials and thermally insulated along its entire 

length.

necessary changes in direction, if any, should be made in the form of gentle bends.

The manufacturer also requires installing the draught regulator and explosion door in the chimney system.

Ventilation of boiler room

According to regulations to ensure users’ safety and proper operation of 

boilers each in-house boiler room has to be equipped with supply and 

exhaust  ventilation.  When  there  is  no  supply  ventilation  at  all  or  the 

existing one is choked, in most cases the boiler will operate incorrectly 

(excess  smoking,  water  condensation,  inability  to  reach  higher 

temperatures), while the purpose of exhaust ventilation is to evacuate 

used  air  and  harmful  gases  from  the  boiler  room.  In  boiler  rooms 

equipped  with  natural  draught  chimney  the  mechanical  ventilation  is 

not allowed.

Figure:  Ventilation in the boiler room.

Supply ventilation.

The supply ventilation duct should have the cross-sectional area equal to one-half of chimney cross-section area, but 

its dimensions should never be less than 20 x 20 cm.

The air supply duct should be made of non-combustible material.

Exhaust ventilation

The exhaust ventilation channel should be made of brick, with cross-sectional area equal to at least 25% of chimney 

cross-sectional area, but with dimensions not smaller than 14 x 14 cm. No devices restricting the area available for air 

by at least 1.5 metre. The duct should be made of incombustible material.

Commissioning

First start-up is carried out by authorised manufacturer’s technicians (payable service).

The  initial  works  carried  out  in  order  to  prepare  the  boiler  for  start-up  should  include  the  general  inspection  of 

technical condition of boiler room, installations and systems, including inspection and control of boiler equipment 

Futura Bio Standard.

Firing up

1.  Fill the tank with fuel.

2.  Connect the boiler to power supply line (put the cable plug into a wall socket).

3.  Start manual fuel feeding mode until fuel appears in the burner (see the controller instruction manual).

4.  Light up fuel on the burner by using paper and small pieces of wood or other kindling material.  

 

6. Operation of the boiler

Supply

ventilation

Exhaust

ventilation

Содержание Futura Bio 100

Страница 1: ...g means saving Futura Bio Pellets Congratulations on your purchase of a modern energy saving biomass fired boiler for central heating purposes Basic fuel Futura BIO Standard boilers sawdust briquettes...

Страница 2: ...ere The Futura Bio boilers with built in biomass burner can be used for heating of residential buildings commercial buildings shops detached houses and so on The Futura boilers may be installed only i...

Страница 3: ...combustion tubes On the front side the boiler has a door to the combustion chamber a hand hole for cleaning of convection ducts and in 25 200 kW with ash box doors The doors exposed to high temperatu...

Страница 4: ...ches Fuse box Fuel tank Mixer Feeding screw drive system Feeding screw Mixers drive Protection wax valve Electrical connections Safety coil Stub pipe for connecting of flow out thermal protection Retu...

Страница 5: ...5 Figure Boiler dimensions 50 kW models Figure Boiler dimensions 75 kW and 100 kW models Figure Boiler dimensions 150 kW models Figure Boiler dimensions 200 250 and 300 350 kW models...

Страница 6: ...sions with extended feeding screw Hinges Actuator Plasticized PVC knob Hold down clamp Fuse box Water tank Rubber hose Clean out hole Gear cover Feeder screw Feeder screw Motor Mixer gear Motor Feeder...

Страница 7: ...upon special order All data presented above is for information purposes only and is subject to changes due to continuous product development Dimensions of boiler and tank may differ from given above B...

Страница 8: ...the design of Futura Bio Pellets boiler with fuel tank and feeding system Mounting of fuel tank in the Futura Bio Pellets boiler is made upon individual orders the capacity and dimensions of fuel tan...

Страница 9: ...l feeder drive 8 Charging duct 9 Burner charging feeder 10 Burner charging drive 11 Forced draught fan 12 Fuel igniter 13 Burner with cast iron insert Fuel tank Fuel mixer with cone and blades Mixer d...

Страница 10: ...10 Top Front Back Left side Figure Dimensions of Bio Pellets 100 kW boiler Figure Dimensions of Bio Pellets 200 250 kW boiler...

Страница 11: ...r source otherwise a risk of electric shock may occur 6 Fuel can be charged only when fuel feeder is stopped General requirements The boiler room where the boiler is to be installed must meet the requ...

Страница 12: ...lass C3 this safe distance must be increased to 400 mm If the inflammability of materials is very high the safe distances specified above must be doubled Flammability classes of materials The boiler l...

Страница 13: ...e licences The external equipment and boiler accessories if any should be connected according to the markings to power supply outputs located on the back cover of boiler housing Electric diagram is al...

Страница 14: ...ting devices and expansion vessels No isolating valves are allowed between the boiler and expansion vessel The hydraulic system of boiler room must ensure the minimum return water temperature at the l...

Страница 15: ...Pressure reducer Domestic cold water Pressure gauge Three way mixing valve thermostatic valve Requirements for boiler water Water used for filling the boiler and central heating system should meet th...

Страница 16: ...ting valve opens at temperature of 95 98 C i e type SYR 3065 6 Safety valve 7 Cleaning funnel 8 Thermal outflow protection sensor temperature controlled valve 9 Connector for connecting the thermal ou...

Страница 17: ...n duct should have the cross sectional area equal to one half of chimney cross section area but its dimensions should never be less than 20 x 20 cm The air supply duct should be made of non combustibl...

Страница 18: ...ycle for minimum and maximum boiler output see instruction manual for boiler controller 6 Fuel feeding times should be so programmed that the previous fuel portion burns completely before the fuel doe...

Страница 19: ...ks at least Walls of combustion chamber can be cleaned through charging door Check if there isn t too much waste material in charging hopper and remove if necessary Once a month the boiler should be d...

Страница 20: ...arings do not need maintenance or re lubricating for the period of 20 000 working hours but no longer than three years Upon expiration of above period of time it is recommended to replace motor bearin...