![CHUNLAN -B Скачать руководство пользователя страница 73](http://html1.mh-extra.com/html/chunlan/b/b_service-manual_2606426073.webp)
Installation
- 71 -
●
A damper block of the same size as the angle steel and thickness greater than 10mm shall
be used on top of the angle steel to reduce vibration;
●
The machine must have 2% slope in drainage connector direction.
4. Installation of auxiliary electric heating
This is limited to FRD95, FRD125/S, FRD180/S and FRD260/S. For FRD71-B and
FRD100-B, auxiliary electric heater is installed at exhaust air port inside the machine.
(1) Auxiliary electric heater installation dimensions
●
Refer to the following figure and table for installation dimensions of FRD95, FRD125/S,
FRD180/S and FRD260/S auxiliary electric heater.
Model
Code
FRD95 FRD180/S
FRD125/S
FRD260/S
a 300
330
(2) Installation of auxiliary electric heater
●
Put the side of auxiliary electric heater with label “Connect this end to indoor unit air
exhaust for installation” on indoor unit air exhaust port and fix with 8 ST4
×
12 tapping
screws;
●
Fix the heater on foundation and stick insulation material on its outer surface and
interface.
Содержание -B
Страница 38: ...Main technical parameters 36 3 Value in is nominal value for auxiliary electric heating...
Страница 43: ...Circuit diagrams 41 Chapter V Circuit diagrams I Circuit diagrams...
Страница 44: ...Circuit diagrams 42...
Страница 45: ...Circuit diagrams 43...
Страница 46: ...Circuit diagrams 44...
Страница 47: ...Circuit diagrams 45...
Страница 48: ...Circuit diagrams 46...
Страница 49: ...Circuit diagrams 47...
Страница 50: ...Circuit diagrams 48...
Страница 51: ...Circuit diagrams 49...
Страница 52: ...Circuit diagrams 50...
Страница 53: ...Circuit diagrams 51...
Страница 54: ...Circuit diagrams 52...
Страница 55: ...Circuit diagrams 53...
Страница 56: ...Circuit diagrams 54...