![CHUNLAN -B Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/chunlan/b/b_service-manual_2606426027.webp)
Exploded view & dismantling sequence of parts
- 25 -
3. Dismantling sequence of outdoor unit of FR(D)95, FR(D)125/S, FR(D)100-B, FR95-C
、
&
FR125-C/S
(1) Remove 1;
(2) Remove 2;
(3) Remove 3 and 4 respectively;
(4) Remove 15;
(5) Remove 14 and 9 respectively;
(6) Remove 17;
(7) Remove 5 and 18 respectively
(8) Remove 20 and 26.
Annex: Dismantling sequence of typical parts
Outdoor electric assembly:
(1) Remove top cover 1;
(2) Remove right panel assembly 4;
(3) Remove cover plate on electric assembly 17.
Outdoor motor:
(1) Remove top cover assembly 1;
(2) Remove left panel assembly 3 and right panel assembly 4 respectively;
(3) Remove front panel assembly 15;
(4) Remove fan 14;
(5) Unplug motor 12 and remove motor.
Outdoor compressor:
(1) Remove top cover assembly 1;
(2) Remove right panel assembly 4;
(3) Remove electric assembly 17;
(4) Remove reversing valve assembly 20;
(5) Remove compressor.
Содержание -B
Страница 38: ...Main technical parameters 36 3 Value in is nominal value for auxiliary electric heating...
Страница 43: ...Circuit diagrams 41 Chapter V Circuit diagrams I Circuit diagrams...
Страница 44: ...Circuit diagrams 42...
Страница 45: ...Circuit diagrams 43...
Страница 46: ...Circuit diagrams 44...
Страница 47: ...Circuit diagrams 45...
Страница 48: ...Circuit diagrams 46...
Страница 49: ...Circuit diagrams 47...
Страница 50: ...Circuit diagrams 48...
Страница 51: ...Circuit diagrams 49...
Страница 52: ...Circuit diagrams 50...
Страница 53: ...Circuit diagrams 51...
Страница 54: ...Circuit diagrams 52...
Страница 55: ...Circuit diagrams 53...
Страница 56: ...Circuit diagrams 54...