background image

TVC-700

U s e r   M a n u a l

020-100906-01

Содержание TVC-700

Страница 1: ...TVC 700 U s e r M a n u a l 020 100906 01 ...

Страница 2: ......

Страница 3: ...TVC 700 U s e r M a n u a l 020 100906 01 ...

Страница 4: ...mited to implied warranties of fitness for a particular purpose Christie will not be liable for errors contained herein or for incidental or consequential damages in connection with the performance or use of this material The product is designed and manufactured with high quality materials and components that can be recycled and reused This symbol means that electrical and electronic equipment at ...

Страница 5: ...rier LEDs 5 Safety Warnings and Guidelines 6 Electrical Safety Precautions 6 General Safety Precautions 6 Operating Precautions 7 Contact Support 7 Install TVC 700 9 Overview 9 Unpack the System 9 Prepare for Rack Mounting Setup 9 Choose a Setup Location 9 Warnings and Precautions 10 Rack Precautions 10 Processor Precautions 10 Rack Mounting Considerations 11 Ambient Operating Temperature 11 Reduc...

Страница 6: ...Processor 21 Connect Devices 21 Input Signals 21 Output Signals 24 Connect Ethernet 25 Connect Display Devices and Screens 25 Mini DisplayPort to DVI D Adaptors 25 Connect Peripheral Devices 26 Connect Power 26 Turn the Processor On 27 Turn the Processor Off 28 Specifications 29 Main Chassis 29 Power Requirements 30 Peripheral Devices 30 Graphics Output 30 Standard Video Capture 31 Dual Link DVI D...

Страница 7: ...MASTERSuite 5 disc that accompanies the TVC 700 Installation Guidelines The TVC 700 processor can be installed in a rack or tower orientation Carefully read the following guidelines to make sure the processor can maintain optimum operation Operating Temperature If installed in a closed or multi unit rack assembly the operating ambient temperature of the rack environment may be greater than the amb...

Страница 8: ...ld be given to supply connections rather than direct connections to the branch circuit e g use of power strips TVC 700 Main Chassis Main Box 4U Processor Sliding rail rack mounting kit optional Accessories Box Christie MASTERSuite 5 software box with software CD TVC 700 User Manual P N 020 100906 xx Operating System CD Windows 7 Ultimate Server Drivers Disk 1 x AC line cord per power supply 2 per ...

Страница 9: ...s well as the activity and health of specific components There are also 2 buttons on the chassis control panel Control Panel Buttons There are 2 buttons located on the front of the chassis a power on off button and a reset button Power The power button is used to apply or turn off the main system power Turning off system power with this button removes the main power but keeps standby power supplie...

Страница 10: ...ive activity when flashing NIC1 Indicates network activity on the LAN1 port when flashing NIC2 Indicates network activity on the LAN2 port when flashing Overheat Fan Fail When this LED flashes it indicates a fan failure When on continuously it indicates an overheat condition which may be caused by cables obstructing the airflow in the system or the ambient room temperature being too warm Check the...

Страница 11: ...d to be replaced This LED should be off when the system is operating normally Drive Carrier LEDs The TVC 700 uses SATA drives Each drive carrier has 2 LEDs Green When illuminated the green LED on the SATA drive carrier indicates drive activity A connection to the SATA backplane enables this LED to blink on and off when that particular drive is being accessed Red When illuminated the red LED indica...

Страница 12: ...y 72 lbs 32 7 kg when fully loaded When lifting the system 2 people at either end should lift slowly with their feet spread out to distribute the weight Always keep your back straight and lift with your legs Place the chassis top cover and any system components that have been removed away from the system or on a table so that they won t accidentally be stepped on While working on the system do not...

Страница 13: ...1 800 221 8025 Enter the information in the table below and keep with your records for future reference NOTE The serial number can be found on the license label Care must be taken to assure that the chassis cover is in place when the TVC 700 is operating to assure proper cooling Out of warranty damage to the system can occur if this practice is not strictly followed Failure to comply may result in...

Страница 14: ...Introduction 8 TVC 700 User Manual 020 100906 01 Rev 1 03 13 ...

Страница 15: ...ar a grounded power outlet Prepare for Rack Mounting Setup The box the TVC 700 was shipped in could include two sets of rail assemblies if ordered two rail mounting brackets and the mounting screws you will need to install the system into the rack Follow the steps in the order given to complete the installation process in a minimum amount of time Please read this section in its entirety before you...

Страница 16: ...t damage Determine the placement of each component in the rack before you install the rails Install the heaviest components on the bottom of the rack first and then work up The TVC 700 weighs approximately 72 lbs 32 7 kg when fully loaded When lifting the system 2 people at either end should lift slowly with their feet spread out to distribute the weight Always keep your back straight and lift wit...

Страница 17: ... operation is not compromised Mechanical Loading Equipment should be mounted into a rack so that a hazardous condition does not arise due to uneven mechanical loading Circuit Overloading Consideration should be given to the connection of the equipment to the power supply circuitry and the effect that any possible overloading of circuits might have on overcurrent protection and power supply wiring ...

Страница 18: ... provided This rail will fit a rack between 26 and 38 25 deep Remove the Chassis Cover and Feet The chassis is shipped with the chassis cover pre installed Although the processor is shipped with the feet not installed you may have previously installed the feet to set up the TVC 700 in tower mode Both the feet and cover must be removed before installing the rails 1 Chassis cover 3 Chassis cover loc...

Страница 19: ...olding the chassis foot in place 3 The foot lock is a tab located in the center of the foot that prevents the foot from sliding Using a flat head screwdriver gently lift the foot lock upward and slide the foot toward the rear of the chassis 4 Repeat steps 2 and 3 with each remaining foot Identify the Sections of the Rack Rails If you also purchased the optional rail mounting kit then the chassis p...

Страница 20: ...Install TVC 700 14 TVC 700 User Manual 020 100906 01 Rev 1 03 13 1 Inner rails 2 Chassis handle ...

Страница 21: ...th the front of the chassis and secure with the 3 chassis handle screws 3 Repeats steps 1 and 2 with the other handle 4 Locate the inner rails and screws in the shipping package 5 Align the inner rails against the chassis as shown Confirm that the rails are flushed against the edge of the chassis 6 Tighten the screws Do not over tighten 7 Repeat steps 5 and 6 with the other inner rail ...

Страница 22: ...ar bracket to the middle bracket 2 Adjust both the brackets to the proper distance so that the rail fits snugly into the rack 3 Secure the rear of the outer rail with two M5 screws and the rear of the rack Note that the outer rail is adjustable from approximately 26 to 38 25 4 Repeat steps 1 3 for the left outer rail ...

Страница 23: ...e outer rails keeping the pressure even on both sides you may have to depress the locking tabs when inserting When the chassis has been pushed completely into the rack you should hear the locking tabs click into the locked position Convert Chassis to Tower Optional The TVC 700 processor is shipped with the chassis cover pre installed but with the chassis feet packaged separately To use the chassis...

Страница 24: ...ver post with the corresponding holes on the top of the chassis and place the cover on top of the chassis The cover should overhang approximately one half inch over the front of the chassis 3 Slide the chassis cover toward the rear of the chassis to lock the cover into place 1 Chassis cover 3 Chassis rack mount ears 2 Chassis feet ...

Страница 25: ...oot in the foot receptacles and slide the foot toward the front of the chassis The foot should lock into place into both foot receptacles 2 Secure the foot to the chassis using 2 screws enclosed in the packaging 3 Repeat steps 1 and 2 for the other chassis foot 1 Foot receptable 3 Chassis foot screws 2 Chassis foot ...

Страница 26: ...Install TVC 700 20 TVC 700 User Manual 020 100906 01 Rev 1 03 13 ...

Страница 27: ...s available for this processor It also touches on some system configuration information All input and display modules are clearly labeled Connect Devices Input and display modules are already installed in the TVC 700 chassis Input Signals The system will accept input signals of the following types Standard video through a 16 input BNC to DB26 cable connection Computer video through a DVI I single ...

Страница 28: ...ls with support for de interlacing DVI D DVI A DVI I RGB VGA via HD15 to DVI I adapter RGB 3 4 5 wire via proper adapter HDMI via HDMI to DVI I adapter and Component via Component to DVI I adapter Standard Input VGA Connectors Signal Description Red Green Blue Hor Comp Vert RGB with H V Sync 5 wire 1 2 3 Red Green Blue H Sync V Sync RGB with composite sync 4 wire 1 2 3 4 5 Red Green Blue Comp Sync...

Страница 29: ... 8 built in decoders A single Standard Video Module can connect up to 8 composite or S video sources Each module can capture and display 8 composite or S video sources simultaneously on one or more displays in a display wall Each module has 2 DB26 connectors Video sources are connected to the module via a DB26 to 16 way BNC splitter cable connected to the top port on the module The bottom port is ...

Страница 30: ...solution Mini DisplayPort to DVI D adapters are provided 6 per display card in your configuration other adapters are available from Christie 6 Port Output Module Each output module has 6 Mini DisplayPort ports which connect to display devices via a Mini DisplayPort to DVI D adapter provided Each output module can connect to 6 display devices or ECUs BNC Connector Input Number Composite S Video Lum...

Страница 31: ...be customized to include up to 3 AMD FirePro W600 modules enabling you to choose from a variety of configurations Mini DisplayPort to DVI D Adaptors To connect display devices to the processor 1 Connect the Mini DisplayPort end of each adapter to the display module connectors on the rear panel 2 Connect the other end of each adaptor to one end of a DVI D cable 3 Connect the other end of each DVI D...

Страница 32: ...the rear panel and connect the 3 pronged end of the line cords to a grounded AC outlet The input voltage must be capable of 100 240 VAC 60 50 Hz 4A The TVC 700 processor comes standard with 2 hot plug redundant power supplies The line cords provided with the processor will be the correct cord for the country for which this product has been ordered Do not attempt to operate the processor if the AC ...

Страница 33: ...it until the operating system cycles through its initialization process This may take several minutes depending on the number of display cards installed NOTE Depending on your display device capabilities you may or may not see the boot up process The resolution of the boot sequence is 640 x 480 3 Depending upon your installation s network policy you may be prompted for a user name and password If ...

Страница 34: ...by button does not completely shut off system power Portions of the power supply and some internal circuitry remain active until AC power is removed If you are powering down for maintenance you must also remove the power cord from each power supply Failure to remove the power cords may increase the risk of personal injury electric shock or damage to the equipment Failure to comply could result in ...

Страница 35: ...n Slots 4 x PCIe 2 0 x16 x16 mechanical 1 x PCIe 2 0 x4 x8 mechanical 1 x PCIe 2 0 x4 x16 mechanical 1 x PCIe 1 0 x4 x16 mechanical not used 2 x PCI 33 MHz not used Cooling 4 x 5000 RPM Hot swap Fan 2 x 5000 RPM Hot swap Rear Exhaust Fan Application Software Christie MASTERSuite 5 Network Intel Dual 82574L Gigabit Ethernet 10BASE T 100BASE TX and 1000BASE T Ports 2x RJ45 LAN ports 6x USB 2 0 rear ...

Страница 36: ...ated Input Frequency 60 50 Hz Rated Input Current 4A Redundant Yes Hot swappable Yes Keyboard Type Standard English Interface USB Mouse Type 2 button optical with scroll wheel Interface USB Card Format PCI Express Gen3 x16 Form Factor Full height half length Graphics Memory 2GB GDDR5 Connectors 6 mDP connectors per card Number of Output Channels 6 per card Display Port Protocol 1 2 Max Power Consu...

Страница 37: ...d Format PCI Express x4 Connectors 2 DB26 connectors Max Data Rate 480 MB s Frame Buffer Memory 32 MB Max Power Consumption 8 watts Max current at 3 3V 250mA Max current at 12V 600mA Number of Capture Channels 8 Max Cards per System 5 40 capture channels Frame Rate 25 30 fps PAL NTSC Max Capture Resolution per Channel 720x576x16 Signal Formats Composite video CVBS S Video Y C Supported Video Stand...

Страница 38: ...on 12 watts Max Current at 3 3V 200mA Max Current at 12V 900mA Input Connector Type Single Link DVI Dual Link DVI Max Cards per System 5 5 capture channels Frame Rate Capable of Quad HD at 24 25 30fps Resolution Digital 640x480 VGA 800x600 1024x768 1280x1024 1600x1200 1920x1080 1920x1200 2048x1536 2560x1600 WQXGA Input Mode Detection Automatic detection of input modes in hardware enabling the trac...

Страница 39: ...Sync on Green 3 Wire Single Link DVI HD15 VGA HDMI or Component with adapter Max Cards per System 5 10 capture channels Frame Rate Dependent upon Resolution see below Resolution Digital 640x480 VGA 800x600 1024x768 1280x1024 1600x1200 1920x1080 1920x1200 WUXGA Resolution Analog 640x480 VGA 800x600 1024x768 1280x1024 1600x1200 1920x1080 2048x1536 QXGA Supported Input Resolutions HD 480p 576p 720p 1...

Страница 40: ...ased on the values in the table below Safety CAN CSA C22 2 No 60950 1 07 2nd Edition UL 60950 1 2nd Edition IEC 60950 1 2005 2nd Edition EN60950 2006 A11 2009 Analog Input Range Min 0 5Vpp Max 1 0Vpp Input Offset 2V Horizontal Sync 15kHz 110kHz Vertical Sync No hardware limits but typically 25Hz 200Hz for real signals Separate Sync Polarity Positive or Negative Separate H Vsync Composite Sync Sync...

Страница 41: ...diators CAN ICES 3 A NMB 3 A CISPR 22 EN55022 Class A Information Technology Equipment Immunity CISPR 24 EN55024 EMC Requirements Information Technology Equipment Marking The TVC 700 is designed to comply with the rules and regulations required for the product to be sold in various regional markets including USA Canada European Union Australia New Zealand Kuwait China Korea Japan Mexico Ukraine Ru...

Страница 42: ...2000m 6561ft max Shock Single event only Half sine 40g 2 3ms Vibration random non continuous 0 5g rms 5 300Hz Non Operating Storage Temperature 40 C to 60 C 40 F to 140 F NOTE Derate by 1 degree C 1 8 degrees F for every 305m 1000ft altitude over 1525m 5000ft Relative Humidity 8 to 90 non condensing Shipping Shock Single event only Half sine 160cm s 2 3ms 100g Square 422cm s 20g Altitude 0 to 9 14...

Страница 43: ... 000 103463 01 ASSY TECH DOCS TVC 700 ...

Страница 44: ...ted Kingdom ph 44 118 977 8000 France ph 33 0 1 41 21 00 36 Germany ph 49 2161 664540 Eastern Europe ph 36 0 1 47 48 100 Middle East ph 971 0 4 299 7575 Spain ph 34 91 633 9990 Singapore ph 65 6877 8737 Beijing ph 86 10 6561 0240 Shanghai ph 86 21 6278 7708 ...

Отзывы: