
3-10
TVC-1211 User Manual
020-100769-01 Rev. 4 (05-2012)
Section 3: Connecting the Controller
3.8.2 Power ON Controller
To power up the controller and initialize the input and display modules:
1. Press the
Power
button on the front panel.
2. Wait until the Windows Server 2003 operating system cycles through its initialization process. This may
take several minutes depending on the number of display cards installed.
NOTE:
Depending on your
display device capabilities you may or may not see the boot up process. The resolution of the boot
sequence is 640 x 480.
3. When the Windows Server login screen appears, login with a valid user name and password.
3.8.3 Power OFF
The front panel Power ON/Standby button does not completely shutoff system
power. Portions of the power supply and some internal circuitry remain active until AC power
is removed. If you are powering down for maintenance, you must also remove the power cord
from each power supply. Failure to remove the power cords may increase the risk of personal
injury, electric shock, or damage to the equipment.
NOTICE:
If installing a hot-plug device, it is not necessary to power down the server
.
1. Close all applications.
2. Shutdown Windows Server 2003 by clicking
Start>Shutdown
.
3. In the Shutdown dialog, select the appropriate reason for shutting down the system. Windows Server 2003
shuts down and the controller enters STANDBY POWER mode. The system power LED changes to
amber.
4. Use the expansion chassis Power switch to turn off the expansion chassis. The power LED will turn OFF.
Содержание TVC-1211
Страница 1: ...TVC 1211 U S E R M A N U A L 020 100769 01 ...
Страница 2: ......
Страница 3: ...TVC 1211 U S E R M A N U A L 020 100769 01 ...
Страница 8: ......
Страница 12: ......
Страница 20: ......
Страница 34: ......
Страница 44: ......
Страница 45: ... 000 103039 01 ASSY TECH DOCS TVC 1211 ...