
Section 3: Connecting the Controller
TVC-1211 User Manual
3-9
020-100769-01 Rev. 4 (05-2012)
3.7
Connecting Power
Connect the approved rated line cords, supplied with the controller, to the AC inlets of the power supplies on
the rear panel(s) and connect the 3-pronged end of the line cords to a grounded AC outlet. The input voltage
must be capable of 100-240 VAC, 15A.
3.7.1 Connect AC Line Cords to TVC-1211 Controller
NOTICE:
The line cords provided with the controller from the Christie factory are approved and rated for
North American use only. Do not attempt to operate the controller if the AC supply and power cord are not
within the specified voltages and power range.
The TVC-1211 base chassis comes standard with 2 hot plug redundant power supplies.
3.7.2 Connect AC Line Cords to Expansion Chassis
NOTICE:
The line cords provided with the controller are approved and rated for North American use only. Do
not attempt to operate the controller if the AC supply and power cord are not within the specified voltages and
power range. This equipment must be grounded to a reliable earth ground. The ground must be installed in
accordance with local electrical safety standards.
The expansion chassis has 4 power supplies. Ensure all power supplies are connected during normal operation.
3.8
Powering ON/OFF
NOTICE:
If this is the very first time the server is powered ON, please refer to the start-up instruction sheet
supplied with the controller for information about configuring the system and activating the operating system.
3.8.1 Power ON Expansion Chassis
If you have an expansion chassis, it must be powered up first so the controller can detect the input and display
modules in the expansion chassis.
1. Open the door on the front of the expansion chassis.
2. Switch ON the Power switch.
3. If a power supply is not plugged in or has failed, an alarm will sound. If the alarm sounds, press the
Alarm
Reset
button, located to the left of the
Power
switch and determine which power supply modules are
missing, disconnected or failed (LED OFF). Power down the expansion chassis and add, connect or
replace power supply modules, as necessary. For maximum redundancy, ensure the expansion chassis can
be powered up without alarm conditions before powering on the main server.
4. Close and secure the door.
Содержание TVC-1211
Страница 1: ...TVC 1211 U S E R M A N U A L 020 100769 01 ...
Страница 2: ......
Страница 3: ...TVC 1211 U S E R M A N U A L 020 100769 01 ...
Страница 8: ......
Страница 12: ......
Страница 20: ......
Страница 34: ......
Страница 44: ......
Страница 45: ... 000 103039 01 ASSY TECH DOCS TVC 1211 ...