![Christie Roadie 4K35 Скачать руководство пользователя страница 33](http://html.mh-extra.com/html/christie/roadie-4k35/roadie-4k35_quick-start-manual_2604041033.webp)
LED expected behavior on power up
Learn the expected behavior of the projector LED and the MCPU board power LED on power up.
Action/Event
Projector LEDs
MCPU board power LED
Applying AC power to the projector
head
Solid red
Solid green
Solid yellow
Yellow
Within the first second
Solid red
Solid green
Solid yellow
Blinking green
At approximately 30 seconds
Off red
Blinking green
Blinking yellow
Blinking green
At approximately 50 seconds
Off/blinking red
Solid yellow
Off green
Solid green
At approximately one minute and 15 seconds, the touch panel controller indicates that it is connected
and shows the home page.
Turning the projector off
When powering off in preparation for inspection or maintenance, always disconnect from AC, and set
the projector breaker and lamp power supply breakers to the off position.
1. On the touch panel controller, tap the Home tab.
2. Tap Power.
Operation
Roadie 4K35 Quick Start Guide
33
020-101671-04 Rev. 1 (01-2016)
Copyright
©
2016 Christie Digital Systems USA Inc. All rights reserved.