5 : M a i n t e n a n c e
CHRISTIE INCORPORATED
P35GPS Projector
5-3
June, 1998
4.
For projectors equipped with automatic turret, slide aperture carrier dovetail out of
plunger connector.
5 . 4 . 2 . O
U T E R
T
I M I N G
B
E L T
1.
Loosen outer belt tension adjust assembly screw (item 6 in
(item 3 in
) up to release tension on outer timing belt (item 5 in Figure 5-2).
2.
Remove outer timing belt.
1: Jackshaft Pulley
2: Motor Pulley
3: Idler
4: Flanged Idler
5: Outer Timing Belt
6: SHC Screw
7: Inner and Outer Idler
Assembly
8: Intermittent Pulley
9: Screw
Figure 5-2: Outer Timing Belt
5 . 4 . 3 . I
N N E R
T
I M I N G
B
E L T
1.
Remove outer timing belt (see
2.
Loosen adjustable inner idler pulley screw (item 1 in
3.
Remove inner timing belt (item 10 in
).
Содержание M35GPS-AT
Страница 14: ......
Страница 20: ......
Страница 32: ......
Страница 42: ......
Страница 48: ......
Страница 78: ......
Страница 86: ......
Страница 87: ......
Страница 88: ......
Страница 89: ......
Страница 90: ...P 3 5 G P S D u a l L e n s T u r r e t P r o j e c t o r CHRISTIE INCORPORATED P35GPS Projector D 2 June 1998...