ii
CP2000-XB Setup Guide
020-100250-02 Rev. 1 (06-2009)
Table of Contents
2.4.3 Cooling...................................................................................................................................... 2-15
Extractor Fan and Duct ...............................................................................................................2-15
Side-Venting Duct (Adapter) ......................................................................................................2-18
Liquid Cooling ............................................................................................................................2-18
2.5 Installing and Connecting Sources ....................................................................................................2-19
2.5.1 Cinema .......................................................................................................................................2-19
2.5.2 Non-Cinema ...............................................................................................................................2-19
2.6 Connecting for Communications .......................................................................................................2-20
TPC .............................................................................................................................................2-20
PC/Laptop, Server or Network ...................................................................................................2-20
2.7 Connecting the Ballast .......................................................................................................................2-21
2.7.1 Configuring the Ballast for Incoming AC..................................................................................2-21
2.7.2 Connect to Projector...................................................................................................................2-21
2.8 Initial Power-up .................................................................................................................................2-22
2.8.1 Set Lamp Type ...........................................................................................................................2-22
2.8.2 Set Cable Length........................................................................................................................2-22
2.8.3 Power-up ....................................................................................................................................2-22
2.9 Maximizing Light Output ..................................................................................................................2-23
2.9.1 Determining Screen Brightness (fL) ..........................................................................................2-23
2.10 Basic Image Alignment ...................................................................................................................2-23
2.10.1 Basic Optical Alignment Procedure.........................................................................................2-24
2.11 Offset and Boresight Alignment ......................................................................................................2-24
2.11.1 Adjust Offset ............................................................................................................................2-25
2.11.2 Adjust Left/Right Boresight.....................................................................................................2-26
2.11.3 Adjust Top/Bottom Boresight..................................................................................................2-27
2.11.4 Copy the Channel Settings To Another Channel .....................................................................2-27
2.11.5 Add Auxiliary Lens..................................................................................................................2-28
2.12 Fold Mirror and Convergence Adjustment ......................................................................................2-28
Fold Mirror Adjustment ..............................................................................................................2-28
DMD Convergence .....................................................................................................................2-28
2.13 Calibrating the CP2000-XB System ................................................................................................2-29
Color Calibration ........................................................................................................................2-29
Electronic Screen Masking .........................................................................................................2-29
Projector Configuration File .......................................................................................................2-29
3: Basic Operation
3.1 Safety Warnings and Guidelines........................................................................................................3-1
3.1.1 General Precautions ...................................................................................................................3-1
3.1.2 AC/Power Precautions ...............................................................................................................3-1
3.1.3 Lamp Precautions.......................................................................................................................3-2
Wear Protective Clothing ............................................................................................................3-2
Cool the Lamp Completely .........................................................................................................3-2
Содержание CP2000-XB
Страница 1: ...CP2000 XB S E T U P G U I D E 020 100250 02...
Страница 2: ......
Страница 40: ......
Страница 52: ......
Страница 59: ...Section 4 Maintenance CP2000 XB Setup Guide 4 7 020 100250 02 Rev 1 06 2009 Figure 4 4 Replacing the Air Filter...
Страница 66: ......