manualshive.com logo in svg
background image

Power precautions

Ensure all power precautions are understood before installing the product.

Warning! If not avoided, the following could result in death or serious injury.

After the replacement of the power supply, hi-pot and ground/earth bond tests must be
performed. Only Christie qualified technicians who are familiar with the necessary precautions
can perform these tests.

Always connect the ground or earth first to reduce shock hazard.

Do not return the current through the ground or earth.

SHOCK HAZARD! The line cord has a maximum power carrying capability. For the maximum
number of tiles that may be connected per daisy chain when connecting to the power supply,
refer to the product specifications.

SHOCK HAZARD! A permanent single-phase connection must be installed between the LED tile
system and the AC power supply.

FIRE AND SHOCK HAZARD! Do not operate the system unless certified power connections,
providing the recommended voltage, are used.

HIGH TOUCH CURRENT HAZARD! To ensure reliable grounding, the power connection must be
made by using an industrial plug (pluggable type B), or be provided by a permanent connection.

A 13-20 A double pole mains circuit breaker, certified for the applicable local regulations, is
required. It must be part of the building installation and easily accessible.

Do not use a wall breaker greater than 20 A. This could result in severe damage to the tile
system in the event of a failure.

Caution! If not avoided, the following could result in minor or moderate injury.

SHOCK HAZARD! The line cord has a maximum power carrying capability. For the maximum
number of tiles that may be connected per daisy chain when connecting to the power supply,
refer to the product specifications.

SHOCK HAZARD! Only use the AC power cord provided with the product or recommended by
Christie.

TRIP OR FIRE HAZARD! Position all cables where they cannot contact hot surfaces, be pulled, be
tripped over, or damaged by persons walking on or objects rolling over the cables.

FIRE HAZARD! Do not use a power cord, harness, or cable that appears damaged.

FIRE OR SHOCK HAZARD! Do not overload power outlets and extension cords.

Only Christie qualified technicians are permitted to open product enclosures.

Replacement parts

Velvet LED Display Panels Service Guide–Apex Series

5

020-102617-01 Rev. 1 (01-2018)

Copyright 

©

 2018 Christie Digital Systems USA Inc. All rights reserved.

Содержание Apex Series

Страница 1: ...Service Guide 020 102617 01 Velvet LED Display Panels Apex Series ...

Страница 2: ...e the product is designed for outdoor use problems or damage caused by use of the product outdoors unless such product is protected from precipitation or other adverse weather or environmental conditions and the ambient temperature is within the recommended ambient temperature set forth in the specifications for such product g Defects caused by normal wear and tear or otherwise due to normal aging...

Страница 3: ...ules 7 Parts and module replacement 8 Removing the LED modules 8 Removing the carrier assembly 8 Replacing the receiver cards 10 Replacing the hub board 11 Replacing the DC filter 12 Maintaining the LED panels 14 Cleaning the LED panels 14 Velvet LED Display Panels Service Guide Apex Series 3 020 102617 01 Rev 1 01 2018 Copyright 2018 Christie Digital Systems USA Inc All rights reserved ...

Страница 4: ...ot avoided the following could result in death or serious injury Observe all electrostatic precautions Use a grounded wrist strap and insulated tools when handling servicing or cleaning electronic assemblies A minimum of two people or appropriately rated lift equipment is required to safely lift install or move the product A certified electrician must be present during installation to ensure the i...

Страница 5: ... or be provided by a permanent connection A 13 20 A double pole mains circuit breaker certified for the applicable local regulations is required It must be part of the building installation and easily accessible Do not use a wall breaker greater than 20 A This could result in severe damage to the tile system in the event of a failure Caution If not avoided the following could result in minor or mo...

Страница 6: ... circuit current capacity that may cause severe burns and electrical arcing SHOCK HAZARD Power supply uses double pole neutral fusing Disconnect all power sources before opening the product Fuses are present in active and neutral lines of the Remote Power Supply Rack Shelf F1 Rated 15 A 250 VAC F2 Rated 15 A 250 VAC Before working with live power systems remove all metallic jewelry such as watches...

Страница 7: ...correctly Description Part number A Receiver card 003 006014 XX B Hub board 003 005730 XX C DC filter 003 005733 XX LED module board LED009 AP 003 005729 XX LED012 AP 003 005722 XX LED012 AL 003 005723 XX LED016 AL 003 005721 XX LED019 AL 003 005727 XX LED025 AL 003 005725 XX Replacement parts Velvet LED Display Panels Service Guide Apex Series 7 020 102617 01 Rev 1 01 2018 Copyright 2018 Christie...

Страница 8: ...LED modules with the original location so they can be reinstalled correctly 5 To re install follow these steps in reverse order 6 If the LED module has been replaced update the module coefficients a Open the E500 software and navigate to Settings Module Flash b Click Check coefficients in modules c After the files have finished loading click Save calibration coefficients on receiving cards d Adjus...

Страница 9: ...ower cables from the carrier assembly 6 Remove the carrier assembly from the assembly rods 7 To re install follow these steps in reverse order ensuring the arrow on the carrier assembly B points up Parts and module replacement Velvet LED Display Panels Service Guide Apex Series 9 020 102617 01 Rev 1 01 2018 Copyright 2018 Christie Digital Systems USA Inc All rights reserved ...

Страница 10: ...e carrier assembly face down on a protected surface 4 Label and disconnect all cables that lead into the receiver cards 5 Using a Phillips screwdriver remove the four screws securing each receiver card to the hub board A Parts and module replacement Velvet LED Display Panels Service Guide Apex Series 10 020 102617 01 Rev 1 01 2018 Copyright 2018 Christie Digital Systems USA Inc All rights reserved...

Страница 11: ... information Calibrating replacement LED modules Replacing the hub board The hub board connects the LED modules with the receiver card 1 Remove the LED modules on page 8 2 Remove the carrier assembly on page 8 3 Place the carrier assembly face down on a protected surface 4 Remove the receiver cards on page 10 5 Label and remove all cable connections from the hub board 6 Loosen the thumbscrews secu...

Страница 12: ...carrier assembly on page 8 3 Place the carrier assembly face down on a protected surface 4 Label and disconnect all cables that lead into the DC filter 5 Using a Phillips screwdriver remove the four screws securing the DC filter to the hub board A Parts and module replacement Velvet LED Display Panels Service Guide Apex Series 12 020 102617 01 Rev 1 01 2018 Copyright 2018 Christie Digital Systems ...

Страница 13: ...ment part follow these steps in reverse order Parts and module replacement Velvet LED Display Panels Service Guide Apex Series 13 020 102617 01 Rev 1 01 2018 Copyright 2018 Christie Digital Systems USA Inc All rights reserved ...

Страница 14: ...of damaging the LEDs clean the panel only if absolutely necessary 1 To clean the LED panels use a dry clean soft cloth with a low lint count or a paint brush to remove any particles 2 To remove loose particles between the LEDs use filtered compressed air Ensure the air compressor does not spray oil or condensation Do not use the following products when cleaning the panels Compressed air cans Liqui...

Страница 15: ...ea Seoul ph 82 2 702 1601 Japan Tokyo ph 81 3 3599 7481 India ph 91 080 6708 9999 Germany ph 49 2161 664540 France ph 33 0 1 41 21 44 04 Eastern Europe and Russian Federation ph 36 0 1 47 48 100 China Shanghai ph 86 21 6278 7708 China Beijing ph 86 10 6561 0240 Brazil ph 55 11 2548 4753 Australia ph 61 0 7 3624 4888 Worldwide offices Italy ph 39 0 2 9902 1161 Consultant offices Canada Kitchener ph 5...

Отзывы: