
Feeder Line Assembly and Suspension
MODEL C2® Plus & MODEL G™ Plus Feeding System
20
MF1255C
Cut the leading 18"
[450 mm]
and last 18"
[450 mm]
off each roll of auger. Also, cut out any other distorted auger
sections and reconnect the auger as specified in the Auger Brazing section of this manual..
1. Use extreme caution when pushing the auger into the auger tubes. Keep your hand away form the
end of the auger tube to avoid injury.
With the auger coiled about 6 feet
[1.8 m]
from the end of the boot, uncoil the auger from the outside
and feed the auger through the boot into the tubes.
Push the auger into the tube in short strokes.
Uncoil and handle the auger carefully to avoid damaging or kinking the auger.
2. If more that one coil is required for each feeder line, the auger ends will have to be brazed together.
Refer to the Brazing the Auger section in this manual.
3. Install the Anchor Bracket to the Power Unit/Gearhead, as shown in
Figure 29
, with the included
5/16-18 Bolts.
KEEP HANDS AWAY FROM PINCH
POINTS WHEN INSTALLING
AUGER.
CAUTION
1255-124 4/2001
1)
Power Unit/Gearhead
3)
Anchor Bracket
2) 5/16-18 Bolts
Figure 29. Assemble the Anchor Bracket to the Power Unit/Gearhead