background image

SELF-CONTAINED BREATHING APPARATUS (CTS-IB-PPE-01) 

 

 

 

©Chlorine Tech Services (Pty) Ltd 

 CIPC Reg # 2018/101848/07

 

Rev # 01/2020/10/15

 

P a g e

 | 7 

The reducer is mounted in the lower area of the back plate. It reduces pressure of 
the  high-pressure  air  from  the  cylinder  to  mid  pressure  at  about  7  bar.  The  air  is 
delivered  through  medium  pressure  hose  to  demand  valve,  reduce  the  pressure 
again  and  then  used  by  the  user.  Turn  the  hand  wheel  and  connect  the  cylinder 
connector with the cylinder. Once the cylinder valve is opened, the user can view 
the pressure indication from the pressure gauge as which is connected to the high-
pressure  hose.  A  pressure  alarm  device  is  equipped  in  the  reducer.  When  the 
pressure of the cylinder is lowered to 55 ± 5 bar, it will give off audible alarm signal 
≥ 90 dB. The alarm device will not be dependent on the ambient air when alarm 
device gives an alarm, so the alarm device will not lose its function even if in high 
humid  atmosphere  or  under  sprinkle  water,  or  even  in  very  low  temperature.  In 
addition, the air consumed for the alarm device’s alarm is ≤ 5 L/min. 

There is also a safety release valve, which is set to about 11 bar, in case there is 
anything wrong and the medium pressure rises, the valve will be opened, release 
the over pressure to guarantee the performance of the demand valve. 

2.6. 

The Demand Valve 

The demand valve is a lung governed demand valve for a compressed air breathing 
apparatus. It is connected between compressed air supply and full-face mask and 
controls the inhaled and exhaled air. The demand is not an independent breathing 
apparatus. It must be used exclusively mounted on a full-face mask. The demand is 
not suitable for underwater diving. 

 
 
 
 
 
 
 
 
 

 

 

 
 
 

1.  Medium Pressure Hose 

3.  Port of Mask 

5.  LDV Button 

2.  Exhaust Button 

4.  Operating Button 

 

 

Don’t push operating button and exhaust button at the same time. Don’t press 
down  the  red  and  black  button  during  the  use,  because  pushing  both  buttons 
can disconnect the demand valve from the mask. 

 

The outer housing of the demand valve is made of high strength engineering plastic 
to endure possible collision. The demand valve must be used with full mask. 

2.7. 

Medium Pressure Hose 

The explosion pressure for medium pressure hose is not less than four times of the 
reducer output pressure. Connection of the medium pressure hose with the demand 

Fig. 4 

Содержание CTS-IB-PPE-01

Страница 1: ...INSTRUCTION BOOKLET CTS IB PPE 01 SELF CONTAINED BREATHING APPARATUS SCBA ...

Страница 2: ...on 5 2 4 Basic Unit Backplate pneumatic system without second connector 5 2 5 Pressure Reducer 6 2 6 The Demand Valve 7 2 7 Medium Pressure Hose 7 2 8 High Pressure Hose 8 3 USE 8 3 1 Mounting cylinder 8 3 2 Connecting cylinder 8 3 3 Donning putting on the SCBA 9 3 4 Doffing taking off the SCBA 12 4 MAINTENANCE INSTRUCTIONS 13 5 CLEANING 14 6 STORAGE 14 7 TECHNICAL SPECIFICATIONS 14 8 ACKNOWLEDGEM...

Страница 3: ...missioning work that has not been carried out by authorized persons ER This product is supporting life and health Inappropriate use maintenance or servicing may affect the function of the device and thereby seriously compromise the user s life Before use the product operability must be verified The product must not be used if the function test is unsuccessful it is damaged a competent servicing ma...

Страница 4: ...ut of the space he s in to fight fire or whatever purpose it is used for 2 2 6 The face mask is of soft moulded nature rubber and five adjustable head straps and a neck strap It has a foam filled or air cushion seal and a full vision visor For correct positioning of the mask the straps should be tightened in the sequence where the first two lower chin straps then the middle pair cheek straps and f...

Страница 5: ...225 150 Light Work 12 20 100 60 150 90 Moderate Work 20 40 60 30 90 45 Heavy Work 40 60 30 20 45 30 Nominal Working Duration Fully Charge Cylinder Capacity 10 40 We subtract 10 as 10 minutes is when the alarm starts ringing and it is a safe period which must be taken into account So a 1200 litres cylinder will last for 1200 40 30 minutes minus the 10 20 minutes Nervousness and excitement can cause...

Страница 6: ...material Materials of the shoulder strap and waist belt are flame resistant polyester webbing flame resistant fabric and flame resistant padding material Wide shoulder padding and waist protective padding make the wearing very comfortable The metal on the back plate straps and waist belt are made of stainless steel are not easily rusted 2 5 Pressure Reducer 1 High Pressure Hose 5 Cylinder Connecto...

Страница 7: ... alarm is 5 L min There is also a safety release valve which is set to about 11 bar in case there is anything wrong and the medium pressure rises the valve will be opened release the over pressure to guarantee the performance of the demand valve 2 6 The Demand Valve The demand valve is a lung governed demand valve for a compressed air breathing apparatus It is connected between compressed air supp...

Страница 8: ...pressure hose from exploding 3 USE The device can be used only after fully maintained and tested If malfunctions or defects were found before using do not use the device Prevent the respirator from sharp objects and prevent it from collision with any objects during the use The device shall be checked and repaired by MSA authorized service centre WARNING 3 1 Mounting cylinder 1 Insert the cylinder ...

Страница 9: ...retighten if necessary 3 3 Donning putting on the SCBA Step 1 Place the SCBA in front of you with the cylinder facing down and the cylinder valve away from you Fully open the shoulder straps and waist belt Lay the shoulder straps and waist belt out to prevent them from tangling Check all components of the device for defects and malfunctions Step 2 Overhead Method Grasp the carrying frame of the ba...

Страница 10: ...t pad aligns with hips Adjust the SCBA into position top of cylinder should be neck high Step 4 Connect waist belt buckle Pull adjusting straps as shown until device is secure Adjust the waist weight belt to suit the weight of the SCBA which should rest comfortably on your hips Tuck strap loose ends into belt Step 5 Press RED LDV button Fig 4 to switch off positive pressure Step 6 Fully open the c...

Страница 11: ...lace chin in facemask chin cup and pull head harness over the head Tighten chin lower straps Tighten cheek upper straps Tighten centre head strap if necessary Step 8 First breathe will switch on LDV to positive pressure mode Inhale and hold breath there must be no leak audible Breathe normally and expelled air should pass free through exhalation valve Check supplementary air supply is working by p...

Страница 12: ...d collapse and hold to face indicating a positive seal 3 4 Doffing taking off the SCBA Step 1 Loosen the chin and cheek straps by pressing the buckles forward using your thumbs Step 2 Reach under and pull the mask off backwards over your head do not pull on the front port Reset Demand Valve by pushing the RED button this will shut the air flow Close the cylinder valve Vent system by pressing Exhau...

Страница 13: ...tus and cylinder pressure should not be lower than 250 bar Component Maintenance Item Minimum intervals for checking maintenance and repair Before use After use Every year Every 3 years Every 9 years Demand valve Cleaning disinfection X Check diaphragm X X Replace diaphragm X Tightness check X X X Check closing pressure X X Overhaul inspection X Reducer Alarm device X X X Replace high pressure sea...

Страница 14: ...ld be machine washed with water not above 40 C Buckles should be well inserted during washing After washing hang them in a ventilated place for a naturally dry 6 STORAGE The apparatus should be stored in a clean dry and well ventilated place Put the apparatus into the package and keep it away from long term exposure to sunshine heat radiation electromagnetic field and devices that may produce ozon...

Отзывы: