background image

チコーエアーテック株式会社 

Copyright CHIKO AIRTEC CO., LTD. 2009 

 

 

 

  9

 

 

 

 

4.3 

リモートコネクタについて

 

Remote connector

 

遠隔操作のための運転信号入力や、フィルタ交換の信号出力などを取り出すことができます。

 

(オスコネクタコード

3M

  別売)

 

It is possible to transfer the operation signal input for the remote control, and the signal output for the 
filter replacement.(male connection cord: 3 meters in option). 

 

コネクタ接続

 

Connector

    

ON

 

コネクタを接続して、

AT

パネル側の操作から遠隔操作に移行することができます。

 

その際の能力レベルは

AT

パネル

OFF

ボタンで記憶されたレベルで運転開始します。

 

It is possible to shift from the operation of the AT-panel side to remote control. 
Suction power level is programmed by touch panel. 
Press the OFF switch on AT panel to remember capacity level. 
 

 

4.4 

運転前の確認

   

Confirmation before operation

 

 

据え付け状態にがたつき等の異常がないかを確認してください。

 

Confirm that the product is installed properly without any abnormality such as backlash. 

 

アースはとれているかを確認してください。

 

Confirm that grounding is done correctly. 

 

電源コ-ド、ア-スの接続、絶縁、定格電圧になっているかを確認してください。

 

Confirm that the power cable and grounding plug are connected correctly, insulation is provided properly, and 

the rated voltage is realized. 

①~③を確認し、用意できましたら、

 

Confirm the items [1] to [3] above, and then proceed to the item [4]. 

 

主電源スイッチを入れて、

AT

パネルの主電源ランプの点灯を確認してください。

 

Turn ON the MAIN POWER switch, and confirm that the MAIN POWER indicator lamp of AT-panel lights. 

 

AT-

パネルの

ON

スイッチを押して運転を確認して下さい。

 

Press the ON switch to start operation. 

 

能力レベルスイッチで、最大能力にし、運転圧力が

4.0

Pa

以下であることを確認してください。

 

4.0

Pa

以上になった場合には、吸込みホース等を調整し、

4.0

Pa

以下にしてください。

 

(吸込みホースが細すぎる場合や、ふさがれている場合には、負荷がかかり過ぎ、故障の原因となります。)

 

Maximize the volume switch, and confirm that operation pressure is less than 4.0 k pa. 

When it is over 4.0 kPa, lower it under 4.0 kPa by adjusting the suction hose. 

(Using the suction hose which is too thin and is clogged may cause failure by the load too much.) 

 

異常音が

(

金属音など

)

ないか確認してください。

 

Confirm that abnormal sounds (such as metallic sounds) are not generated. 

 

吸込みホ-スの接続がしっかりつながれているか確認してください。

 

Confirm that the suction hose is connected securely. 

 

 

 

 

 

吸込

吸込

吸込

吸込みホースや

みホースや

みホースや

みホースや吐出

吐出

吐出

吐出しホースがふさがれると

しホースがふさがれると

しホースがふさがれると

しホースがふさがれると空気

空気

空気

空気が

が流

流れなくなり

れなくなり

れなくなり

れなくなり、

 

モーター

モーター

モーター

モーター焼

焼けの

けの

けの

けの原因

原因

原因

原因となります

となります

となります

となります。

 

ホースは

ホースは

ホースは

ホースは、

、5

5メートル

メートル

メートル

メートル以下

以下

以下

以下のものをご

のものをご

のものをご

のものをご使用

使用

使用

使用ください

ください

ください

ください。

 

Clogging the suction hose or discharge hose hinders air flow, and 
may stops operation. 

Use the hose (length: shorter than 5 meters) 

Содержание CBA-080AT-HC

Страница 1: ...lead to a serious accident caused by incorrect handling CAUTION This symbol indicates cautions to assure safe use and actions that may lead to failure caused by incorrect handling Instruction Manual M...

Страница 2: ...osene paint etc Explosive dust Aluminum magnesium titanium zinc epoxy etc Dust containing sparks Dust containing sparks generated by high speed cutters grinders welding machines etc Fire sources Cigar...

Страница 3: ...onfirmation before operation 9 4 5 Operation procedure 10 5 Remote Cable Sold Separately 11 5 1 Electrical circuit diagram 11 5 2 Remote Cable 11 5 3 Color and signal of each wire 12 5 4 Remote operat...

Страница 4: ...t outdoors 0 40 80 Install the product in a place without dew condensation at room temperature ambient temperature 0 to 40 C humidity 80 or less High temperature and dew condensation may cause electri...

Страница 5: ...pair 1 6 Disposal Dispose of the product properly as industrial wast 2 Confirmation and Preparation at Arrival After unpacking make sure that all parts are provided Contact our company immediately if...

Страница 6: ...rimary filter Collecting Adsorbing fine dust and fumes Secondary filter Protecting the circuit and the electrical parts Exhaust filter Exhaust treatment 3 Power cable 3m Exhaust port AT AT Panel opera...

Страница 7: ...z CBA 1200AT HC V1 CE 200V 240V 50 60Hz CBA 2000AT HC V1 200V 50 60Hz 10 3m The allowable supply voltage range is 10 The power cable of 3 m with a grounding plug is included 4 2 AT AT panel Filter sat...

Страница 8: ...o Push here to lower gradually suction speed Minimum Lo 40 power Hi 1 1 100 Hi Push here to increase gradually suction speed Maximum Hi 100 power ON OFF ON OFF switch and Main Power supply Light up Re...

Страница 9: ...grounding plug are connected correctly insulation is provided properly and the rated voltage is realized Confirm the items 1 to 3 above and then proceed to the item 4 AT Turn ON the MAIN POWER switch...

Страница 10: ...to a proper position Turn ON the MAIN POWER switch and confirm that the power indicator lamp lights Starts the dust collector AT ON Press the ON switch to start the operation 7 Choose operation abili...

Страница 11: ...s put inside a shrinkable tube so that it cannot be short circuited with other wires Remote operation switch ON Shifting to remote mode Remote control is possible in the ON and the panel is impossible...

Страница 12: ...panel is disabled while the wires 4 and 8 are short circuited Yellow white Black White Operation pressure signal Output signals Transfers the current operation output Analog signal 1 5V Impedance 4 7...

Страница 13: ...in body Transfer required output signals in accordance with the explanation in 5 3 Color and signal of each wire AT ON Lo Hi Change with Lo Hi switch pushing the ON switch of main body AT panel when y...

Страница 14: ...filter grid frame should be located on the exhaust side Make sure to turn OFF the main power and disconnect the power plug from the electrical outlet to cut off the electricity before starting inspec...

Страница 15: ...s into the clearance on the left and right sides between the filter case and the filter to remove the filter easily Remove the primary filter from the filter case The paper packing of the primary filt...

Страница 16: ...g operation Does the suction hose end offer proper suction force Is the clogging indicator lamp extinguished When the fuse is blown out by excessive current generated by a trouble in the internal equi...

Страница 17: ...ing 1 to 3 above remove the cause of error and press the RESET switch Or turn OFF and ON the MAIN POWER switch to reset the error status Start the operation 30 minutes later Fuses are blown out 6 5 Re...

Страница 18: ...IRTEC CO LTD 2009 18 8 Indication of DANGER Labels P r o h i b i t i o n l a b e l P r o h i b i t i o n o f d i s a s s e m b l y W a r n i n g l a b e l H i g h v o l t a g e P r o d u c t n a m e p...

Страница 19: ...Copyright CHIKO AIRTEC CO LTD 2009 19 9 Electrical Circuit Diagram CBA 080AT HC 100V CBA 080AT HC CE 200 240V...

Страница 20: ...Copyright CHIKO AIRTEC CO LTD 2009 20 CBA 1200AT HC CE CBA 500AT HC CE...

Страница 21: ...s CBA 080AT HC V1 250 100 110 Single phase 4 5 50 60 1 5 8 5 54 67 10 0 CBA 080AT HC V1 CE 400 200 240 Single phase 3 0 50 60 1 5 7 8 8 9 200V 240V 54 67 14 5 CBA 500AT HC V1 450 100 110 Single phase...

Страница 22: ...2525 50 V1 CBA 500AT HC V1 FB 30 CHF 3030 50 CHF 3030 50 HEP 3030 69 V1 CBA 500AT HC V1 CE FB 30 CHF 3030 50 CHF 3030 50 HEP 3030 69 V1 CBA 1200AT HC V1 FB 30 CHF 3030 50 CHF 3030 50 HEP 3030 69 V1 CH...

Страница 23: ...emo about purchase Model Manufacturer s serial number Date of purchase Start of operation Your name Address Phone Person in charge LTD 562 0012 2 27 24 2 27 24 Hakushima Minoh City Osaka apan 562 0012...

Отзывы: