Chigo CMV-MINI Скачать руководство пользователя страница 17

13

H5

H6

H7

H9

H10

H11

Fault Code

Fault Contents

H4

20-minute break at first or 2-minute break later

Remark

P2

P3

P4

P5

P6

P9

P10

P1

P12

P13

L0

L1

L2

L4

L5

P11

L7

L8

L9

Display P6 protection for 3 times within 30 minutes

Display P2 protection for 3 times within 30 minutes

Display P4 protection for 3 times within 100 minutes

Reduction of indoor units

Display P9 protection for 2 times within 10 minutes

Display P3 protection for 3 times within 60 minutes

Display P13 protection for 2 times within 10 minutes

High-voltage protection

Low-voltage protection

Various frequency over-current protection

Exhaust overheating protection

Pipe overheating protection

Module protection

DC fan fault

Anti-typhoon protection

Refrigeration T2 overheating protection

Fault of the heating fan continuously working for 5 minutes in area A

Current detection error protection

DC compressor module fault

DC bus low voltage protection

DC bus high voltage protection

MCE fault / sync / closed loop

Zero speed protection

Phase sequence error protection

Protection when the speed change of two 

successive periods exceeds 15Hz

Protection of speed change (> 15Hz) for 

the previous time and the next time 

Restore when powering on

Indoor units are lost for more than 3 minutes. It can't be 

restored until number of indoor units are restored.

Display H5 after P2 protection for 3 times within 30 minutes 

Restore when powering on

Restore when powering on

Restore when powering on

Display H4 after P6 protection for 3 times within 30 minutes

Display H9 after P9 protection for 2 times within 10 minutes

12, 14

,

16and 18kW are effective. 8 and 10kw have no such faults. 

Display H6 for 3 times within 100 minutes

6

 

Trial Run

6.1 Inspection and confirmation before debugging

1)

Check and make sure the refrigerating pipeline and communication line connecting with the indoor and outdoor units are connected with the same 

refrigerating system. Otherwise, some running faults occur. .

2)

The power supply voltage is within the rated voltage of ±10%.

3)

Check and make sure the power supply line and the control line are correctly connected.

4)

Before power-on, make sure there is no short circuit.

2

5)

Check if all units have passed 24-hour nitrogen pressure-maintaining (40kgf /cm ) test.

6)

Make sure the debugged system is fully vacuumized, dried and filled with the refrigerant as specified.

6.2 Preparation before debugging

1)

Calculate the refilling volume of refrigerant for each set of units according to the length of on-site liquid pipe. 

2)

Prepare the required refrigerant.

3)

Prepare the system plan, system piping diagram and control wiring diagram. 

4)

Mark the set address codes on the system plan.

5)

Turn on the power supply switch of the outdoor unit in advance, and make sure it is power-on for more than 12 hours, so that the heater heats the 

compressor oil.

6)

Fully  open  air  pipe  check  valve,  liquid  pipe  check  valve  and  oil  balance  valve  of  the  outdoor  unit.  If  they  are  fully  opened,  the  machine  may  be 

damaged.

7)

Check if the power supply phase sequence of the outdoor unit is correct.

8)

Check if all dialing switches of the indoor and outdoor units are set according to the technical requirements of the product.

6.3 Filling of names of connecting systems

Indoor unit type

Room name
Example: 2nd floor, first system, indoor (A)
Remark: -2F-1A

Fig. 6-1 Filling of Names of Connecting Systems

Содержание CMV-MINI

Страница 1: ...ppearance of your air conditioner is different from that of the air conditioner in the Manual it will not affect its operation and use Please read this Manual before use carefully and keep this Manual...

Страница 2: ......

Страница 3: ...Table of Contents 1 Safety Precaution 1 2 Key Points for Construction Inspection 1 3 Installation of Outdoor Unit 2 4 Installation of Connecting Pipe 4 5 Electrical Wiring 10 6 Trial Run 14...

Страница 4: ......

Страница 5: ...ction Inspection 2 1 Arrival of goods and open case inspection 1 When receiving the machine check if there is any damage in transportation If any surface or internal damage is found please inform the...

Страница 6: ...installation and maintenance 2 No barrier at the air inlet and the air outlet and away from strong wind 3 Dry and ventilated 4 The flat supporting surface is able to bear the weight of the outdoor uni...

Страница 7: ...o be careful to hoist the machine 4 Don t hold the suction inlet of the housing or it will be deformed 3 5 Installation and maintenance space of outdoor unit 1 Provide a firm and adequate foundation t...

Страница 8: ...nnecting pipe Threaded connection Gas side connecting pipe Liquid side connecting pipe Welding 4 Installation of Connecting Pipe 4 1 Refrigerant pipe 1 Flaring Use a pipe cutter to cut the refrigerant...

Страница 9: ...efrigeration system When fastening the nut too strong force will damage the flared socket but too weak force will result in leakage Please refer to the tightening torque in the table above to fasten t...

Страница 10: ...e diameter Pipe Capacity of Outdoor Unit kW Dimension of Main Pipe mm L 30m 1 L 30m 1 Liquid pipe 9 52 Liquid pipe 15 88 Liquid pipe 9 52 Liquid pipe 15 88 10 5 9 52 15 88 9 52 19 05 14 16 Table 4 3 D...

Страница 11: ...7...

Страница 12: ...refrigerant pipe is installed and connected to the indoor unit and before the connecting pipes between the indoor and outdoor units are connected to the valves of the outdoor units refill the nitrogen...

Страница 13: ...t keep the vacuum pump on for 1 2h 4 6 Refilling volume of refrigerant The refilling volume of refrigerant R410A is calculated according to the diameter and length of the pipe at the liquid side of th...

Страница 14: ...tem of the indoor unit shall be incorporated into the same system To reduce the interference the indoor and outdoor communication cables shall use two core or three core shielded twisted pair cables i...

Страница 15: ...shielding net shall be connected to the ground Never connect the power line strong current to the terminal block of the signal line weak current Otherwise the power board will be burnt out 5 2 Wiring...

Страница 16: ...play Control parameters only for use of development personnel Control parameters only for use of development personnel Spot check Content 1 2 3 4 5 6 7 8 9 10 No Spot check Content 12 13 14 15 16 17 1...

Страница 17: ...utes 12 14 16and 18kW are effective 8 and 10kw have no such faults Display H6 for 3 times within 100 minutes 6 Trial Run 6 1 Inspection and confirmation before debugging 1 Check and make sure the refr...

Страница 18: ...olume of refrigerant before delivery see the nameplate refilling volume of refrigerant corresponding to the length of pipe 3 B Calculate the indoor volume B m by the minimum volume Critical concentrat...

Страница 19: ......

Страница 20: ...ong CHIGO Heating Ventilation Equipment CO LTD Address Chigo Industrial District Nanhai Foshan Guangdong China P C 528244 Tel 86 757 8836905 Fax 86 757 88783793 4006 757 555 Hotline Web http www chigo...

Отзывы: