background image

YSM2

Installation Instructions

6

Steel Stud Installation - Site Requirements

WARNING:

IMPROPER INSTALLATION CAN LEAD TO EQUIPMENT FALLING CAUSING SERIOUS PERSONAL INJURY

OR DAMAGE TO EQUIPMENT!  The figure below identifies the minimum reguirements for installation of display mounts onto a
steel stud structure. If the structure or its components do not meet these requirements contact the mount manufacturer for specific
instructions before attempting installation. It should also be noted that no other equipment should be mounted to the same stud.

Figure 3

If back side of wall is unfinished, drywall must be installed
to a minimum of one stud left and right of the stud(s)
being used to install the mount.

Steel Stud (2 x 4 / 25ga minimum)

Drywall

5/8" minimum
Drywall Thickness

Display Mount Installation Location

FRONT

(Both Sides of Stud)

(Must be centered over two studs)

There must be a minimum of
1-7/8" (48mm) clearance
inside wall

Содержание YSM2

Страница 1: ...I N S T A L L A T I O N I N S T R U C T I O N S Wall Mount Speaker Bracket YSM2 ...

Страница 2: ... possibility of damage or destruction of equipment if you do not follow the corresponding instructions WARNING Failure to read thoroughly understand and follow all instructions can result in serious personal injury damage to equipment or voiding of factory warranty It is the installer s responsibility to make sure all components are properly assembled and installed using the instructions provided ...

Страница 3: ...s fixations Phillips Screwdriver Destornillador Phillips Kreuzschlitzschraubendreher Chave de fendas Phillips Cacciavite a stella Kruiskopschroevendraaier Tournevis à pointe cruciforme Pencil Mark Marcar con lápiz Stiftmarkierung Marcar com lápis Segno a matita Potloodmerkteken Marquage au crayon Drill Hole Perforar Bohrloch Fazer furo Praticare un foro Gat boren Percez un trou Open Ended Wrench L...

Страница 4: ...YSM2 Installation Instructions 4 TOOLS REQUIRED FOR INSTALLATION PARTS 7 32 5 5mm 2 D 4 1 4 20 x 2 E 8 M4 x 10mm F 4 M6 x 12mm G 4 10 24 x 5 8 H 8 M4 J 4 1 4 20 x 1 3 4 K 4 1 4 L 4 B 1 C 1 A 1 ...

Страница 5: ...ree of gas water waste or any other plumbing before cutting drilling or installing fasteners NOTE Instructions are included for installing the YSM 2 in a wood stud wall or a steel stud wall application Proceed to the appropriate section for further information Wood Stud Installation 1 Using a stud finder locate and mark the two studs to which the YSM 2 will be installed 2 Using a nail through the ...

Страница 6: ...requirements contact the mount manufacturer for specific instructions before attempting installation It should also be noted that no other equipment should be mounted to the same stud Figure 3 If back side of wall is unfinished drywall must be installed to a minimum of one stud left and right of the stud s being used to install the mount Steel Stud 2 x 4 25ga minimum Drywall 5 8 minimum Drywall Th...

Страница 7: ...until cap flange is flush with wall See Figure 5 9 Snap off plastic straps on anchor at wall by pushing side to side snapping off straps level with flange of plastic cap See Figure 6 Figure 6 10 Repeat Steps 6 through 9 for each mounting hole 11 Place wall bracket A over anchors and align mounting holes in wall bracket with holes in anchors See Figure 7 12 Place four flat washers K onto four 1 4 2...

Страница 8: ...s to left and right side of speaker using four M4 x 10mm Phillips screws E on each bracket See Figure 9 Connecting Speaker to Wall Bracket 1 Insert four 10 24 x 5 8 Phillips screws G into the sides of the wall bracket A and partially thread them into the holes See Figure 10 Figure 10 2 Lift speaker and tip towards wall bracket engaging the speaker bracket B and C top slots over the wall bracket to...

Страница 9: ...Installation Instructions YSM2 9 Figure 11 3 2 Engage top slot over top screw Engage lower slot over lower screw END VIEW Speaker Wall Bracket A YP 1000 Speaker Shown ...

Страница 10: ...2 894 6918 Europe A Fellenoord 130 5611 ZB EINDHOVEN The Netherlands P 31 0 40 2668620 F 31 0 40 2668615 Asia Pacific A Room 30I Block D Lily YinDu International Building LuoGang BuJi Town Shenzhen CHINA Post Code 518112 P 86 755 8996 9226 8996 9236 8996 9220 F 86 755 8996 9217 8800 000064 2007 Chief Manufacturing www chiefmfg com 05 07 ...

Отзывы: