Installation Instructions
XFA1U
5
TOOLS REQUIRED FOR INSTALLATION
PARTS
#2
3/16” (included)
1/8” (included)
7/32" (5.3mm) - wood studs
3/8" (10mm) - concrete
1/2" (12.7mm) - steel studs
1/2" (deep)
G (1)
[Column assembly]
L (1)
3/16”
J (10)
[FCA clip]
K (10)
[Cable tie]
Q (1)
3/16”
N3 (1)
P (1)
1/8”
C (1)
[Component bracket]
D (2)
#10-24 x 3/8”
E (2)
#10-24
F (2)
#10
M (1)
[CPU strap]
[5/16" slotted washer]
N (1)
[Hardware bag]
N1 (4)
5/16 x 2 1/2"
N2 (4)
Ux10x60mm
(not used)
R (1)
[Steel stud hardware bag]
R1 (4)
1/4-20 x 1 3/4"
R2 (4)
1/4"
R3 (4)
[1/4-20 toggle anchor]
H (1)
[Hardware bag]
HA (8)
M4x16mm
HB (6)
M4x20mm
HC (6)
M4x25mm
HD (6)
M5x16mm
HE (6)
M5x20mm
HF (6)
M5x25mm
HG (6)
M6x16mm
HH (6)
M6x25mm
HI (6)
M8x20mm
HJ (6)
M8x30mm
HK (4)
M8x50mm
HL (8)
1/4”
HM (8)
1/2”
HN (8)
[universal]
HP (1)
M5
B (2)
[Interface upright]
A (4)
[Upright cover]
T (6)
[Cable clip]
Содержание XFA1U
Страница 15: ...Installation Instructions XFA1U 15 ...