Installation Instructions
RPME
3
DIMENSIONS
TOOLS REQUIRED FOR INSTALLATION
PARTS
1.49
37.7
ROLL
ADJUSTMENT POINT
3
6.50
165.1
20
4.36
110.8
YAW
ADJUSTMENT POINT
20
1/4" (6.4mm) dia. (concrete)
3/32" (2.4mm) dia. (wood)
5/32" - security
(included)
#2
Hardware required - not included
(dependent on installation method)
1.
Install to threaded extension column
•
1-1/2" NPT or NPSM steel or aluminum threaded
extension column rated for 50 lbs or greater
2.
Install to wood ceiling joists
•
#10-24 x 3" Phillips head wood screws (Qty. 4)
•
1/4" washers (Qty. 4)
3.
Install to concrete
•
Toggler AF6 Alligator concrete anchors (Qty. 4)
•
1/4" washers (Qty. 4)
•
#10-24 x 3" Phillips head wood screws (Qty. 4)
4.
Install to threaded rod
•
1/4-20" steel threaded rods (Qty. 4)
•
1/4-20" channel nuts (Qty. 4)
•
1/4" jam nuts (Qty. 8)
•
1/4" washers (Qty. 8)
A (1)
[RPME]
B (1)
[Example of SLM bracket]
C (2)
M6x16mm
D (2)
M6x16mm (security)
Содержание RPME Elite Series
Страница 25: ...Installation Instructions RPME 25 ...
Страница 26: ...RPME Installation Instructions 26 ...
Страница 27: ...Installation Instructions RPME 27 ...