background image

 PWRSKU

Installation Instructions

6

Mount Installation And Adjustment

Mount Installation

After determining the site meets the installation requirements:
1.

Identify desired mounting location on wall.

2.

Using a stud finder or similar method locate studs.

3.

Align mounting holes in mount with studs making sure 

mounting holes are centered on studs. (See Figure 2)

WARNING:  

IMPROPER INSTALLATION CAN LEAD TO 

EQUIPMENT FALLING CAUSING SERIOUS PERSONAL 
INJURY OR DAMAGE TO EQUIPMENT! Make sure upper 
and lower mounting holes are used on both sides of both the 
upper and lower wall plates. (See Figure 2)

4.

Mark location of eight mounting holes on wall.

5.

Drill eight 1/2" (Ø13mm) holes. (See Figure 2)

Figure 2

6.

Hold metal channel on anchor (D) flat alongside plastic 

straps  and slide  channel    through  hole.   (See Figure 3)                                                        

Figure 3

7.

Holding plastic straps on anchor (D), pull anchor away from 

wall until channel rests flush behind wall making sure 

anchor channel is positioned vertically on stud. (See Figure 

4)

8.

Slide plastic cap on anchor (D) towards wall until flange of 

cap is flush with wall. (See Figure 4)

Figure 4

9.

Snap off plastic straps on anchor at wall by pushing side to 

side, snapping off straps level with flange of  plastic cap.    

(See Figure 5)          

10. Repeat steps 6 through 9 for each mounting hole.

Figure 5

11. Place mount over anchors and align mounting holes in 

display mount with holes in anchors. (See Figure 6)

12. Place flat washer (B) onto Phillips pan head screws (C).
13. Insert Phillips pan head screws (C) with flat washer (B) 

through mounting hole in display mount and into anchor (D) 

and tighten until flush against mount. DO NOT overtighten! 

(See Figure 6)

14. Repeat steps 6 through 13 for remaining 7 mounting holes.

1/2" (Ø13mm) x8

Mounting holes

centered on

studs

1

3

4

5

(D) x8

Drywall

Plastic Straps

6

Plastic Cap

Steel Stud

Drywall

Anchor Metal Channel

SIDE VIEW

(D) x8

8

Plastic Straps

Steel Stud

Drywall

Anchor Metal Channel

Plastic Cap

SIDE VIEW

9

Содержание PWRSKU

Страница 1: ...es de Instalação Istruzioni di installazione Installatie instructies Instructions d installation Large Flat Panel Steel Stud Wall Mount Spanish Product Description German Product Description Portuguese Product Description Italian Product Description Dutch Product Description French Product Description PWRSKU ...

Страница 2: ...structions provided WARNING Failure to provide adequate structural strength for the installation of this kit can result in serious personal injury or damage to equipment It is the installer s responsibility to make sure the structure to which this mount is attached can support five times the combined weight of all equipment WARNING Exceeding the weight capacity can result in serious personal injur...

Страница 3: ...HE MOUNT SEE PSB XXXX DRAWING ALSO 3 93 100 533 21 00 62 279 10 99 27 00 686 635 25 00 432 17 00 25 1 00 302 11 90 493 19 40 228 8 96 2 43 4 74 120 INCHES THE FOLLOWING FORMAT Mounting Pattern ALL MEASUREMENTS ARE IN MILLIMETERS PRODUCT FEATURES WEIGHT CAPACITY 125 LBS HEIGHT ADJUSTMENT 0 TILT ROLL YAW 5 15 2 5 0 25 03 636 3 50 89 Extended Tilted Down Tilted Up Unit Depth Retracted Tilt Adjustment...

Страница 4: ...PWRSKU Installation Instructions 4 TOGGLERĂ x1 I M 1 4 1 2 Ø13mm B 8 E 2 C 8 D 8 1 4 20 x 1 3 4 A 1 G 4 F 1 H 1 J 2 1 4 20 SNAPTOGGLE BB K 12 TOOLS REQUIRED FOR INSTALLATION AND PARTS ...

Страница 5: ...uld be mounted to the same stud Figure 1 to a minimum of one stud left and right of the stud s Stud type and structural strength must conform to the North American Drywall 1 2 100 lbs max or Drywall Thickness Display Mount Installation Location FRONT Both Sides of Stud Must be centered on stud There must be a minimum of 1 7 8 48mm clearance inside wall 16 or 24 on center Studs If back side of wall...

Страница 6: ...om wall until channel rests flush behind wall making sure anchor channel is positioned vertically on stud See Figure 4 8 Slide plastic cap on anchor D towards wall until flange of cap is flush with wall See Figure 4 Figure 4 9 Snap off plastic straps on anchor at wall by pushing side to side snapping off straps level with flange of plastic cap See Figure 5 10 Repeat steps 6 through 9 for each moun...

Страница 7: ...nd positioning as shown in figure below See Figure 7 2 Lower bottom of upper wall channel cover E and tap firmly across bottom of channel to lock in place as shown in figure below See Figure 7 3 Install R H and L H end caps G by aligning tabs on end caps with slots in wall channel and sliding tabs into channel until end cap is flush with wall channel cover cover E 4 Repeat steps 4 through 6 above ...

Страница 8: ... engaged See Figure 8 and See Figure 9 Figure 8 NOTE Holes are provided in the faceplate for use with a padlock or similar locking device if desired In addition the pin and nut may be removed from the upper holes and moved to the lower holes for use as a more permanent locking device See Figure 9 Figure 9 CABLE MANAGEMENT WARNING IMPROPER INSTALLATION CAN LEAD TO SERIOUS PERSONAL INJURY OR DAMAGE ...

Страница 9: ...ntal alignment Roll of the display to be adjusted up to 2 deg right or left to level the display after installing To adjust Roll 1 Loosen the roll tension adjustment nut located on the back side of the faceplate assembly See Figure 11 2 Level display 3 Tighten roll tension adjustment nut See Figure 11 Figure 11 2 1 3 ...

Страница 10: ...ee Figure 12 NOTE The display may need to be repositioned in order to gain access to the tension adjustment screw s 3 Check swing arm tension If desired tension is present tension adjustment is complete If additional tension adjustment is required repeat steps 2 thru 4 until desired tension is achieved NOTE If changing from a smaller display to a larger display may be necessary to increase swing a...

Страница 11: ...Installation Instructions PWRSKU 11 ...

Страница 12: ...e A Fellenoord 130 5611 ZB EINDHOVEN The Netherlands P 31 0 40 2668620 F 31 0 40 2668615 Asia Pacific A Room 24F Block D Lily YinDu International Building LuoGang BuJi Town Shenzhen CHINA P 86 755 8996 9226 F 86 755 8996 9217 Chief Manufacturing a division of Milestone AV Technologies 8832 000224 RevD 2008 Milestone AV Technologies www chiefmfg com 08 08 ...

Отзывы: