Installation Instructions
TIL1X2PT / TIL1X3PT / TIL1X4PT / TILVABPT
4
TOOLS REQUIRED FOR INSTALLATION
PARTS
Hardware Required - not included
(for installation into steel stud walls)
1.
Chief brand FCAT1 Toggler Kit;
OR
2.
Hardware for installation to steel stud wall:
•
1/4-20 Toggler Snaptoggle BB (Qty 4)
•
1/4-20 x 2-1/2" hex head
bolt (Qty 4)
•
1/4" washer (Qty 4)
7/32"
#2
Level
[4+ ft. long]
[Small level]
3/8"
1/2"
Ratchet with
1/2" drive
String
1" deep
well socket
Mounting Hardware Kit (Qty per bag)
N (2)
[Vertical connector]
P (1)
[TIL1X2PT]
Q (1)
[TIL1X3PT]
R (1)
[TIL1X4PT]
OR
OR
TiLEDPT Hardware Kit (Qty per bag)
[Adjustment
washers]
B (4)
[UX10x60R anchor]
C (4)
5/16 x 2-1/2"
D (4)
5/16"
E (2)
1/4-20
F (4)
1/4"
G (6)
#10 x 1/2"
H (2)
1/4-20 x 4-1/2"
J (8)
10-24 x 1"
Mounting Button Kit (Qty per bag)
K (4)
M5x20mm
L (4)
[Mounting button]
TILVABPT Vertical Connector Kit [Sold separately]
M (8)
1/4-20 x 1/2"
TIL1X2PT: 2 bags
TIL1X3PT: 3 bags
TIL1X4PT: 4 bags
A - Left (1)
A - Right (1)