MSP-WL4
Installation Instructions
10
Swing Arm Pivot Adjustment
1.
Adjust pivot position as desired. (See Figure 15)
2.
Adjust pivot point tension screws to change pivot
adjustment tension. (See Figure 15)
Figure 15
Cable Management
1.
Install array cable clips (L) to back of array. (See Figure 16)
2.
Route cables through array cable clips (L) as desired. (See
Figure 16)
3.
Route cables along mounting arm and through arm cable
clips. (See Figure 16)
Figure 16
pivot point
tension
(L)
2
1
3
arm cable clips