LW46/47/48/49/50/55UxP
Installation Instructions
16
5.
Line up anchor with attachment point.
6.
Insert 1/4-20 x 1-3/4" Phillips pan head screw (AD) through
1/4" washer (AE), corresponding mounting hole in wall
bracket and into anchor (AC), and tighten until flush against
wall bracket. DO NOT over tighten! (See Figure 23)
Figure 23
Drywall
Anchor metal channel
(AD) x 4
6
Steel stud
(AE) x 4
(side view)
Wall bracket
(if present)
Site Requirements for Steel Stud Installation
Figure 24
Steel Stud (2 x 4 / 25ga minimum)
FRONT
There must be a minimum of
1-7/8" (48mm) clearance
inside wall
16" or 24" (on center) Studs
If back side of wall is unfinished,
to a minimum of one stud left
Stud type and structural strength must conform to the North American Specification for the
Drywall
**1/2" minimum
Drywall Thickness
(Both Sides of Stud)
**See Warning statement
on page 2!
Design of Cold-Formed Steel Structural Members. [362 S 125 18, C-Shaped, S-Stud Section]
drywall must be installed
and right of the stud(s) being used
to install the mount. Drywall must be
secured to studs with screws a
maximum of 12" (305mm) apart
down center of stud.