Installation Manual BM-8-902
Mounting Kit
Specifications and dimensions are subject to change without notice and do not constitute any liability whatsoever.
Zemic Europe B.V.
T: +31 76 50 39480
Nr. 2022.11 Installation Manual BM-8-902 Rev1
Page 1/5
General
Please read this
BM-8-902 Mount
installation manual carefully in order to profit fully from the load cell
application.
Take care that the mounts and load cells are applied within their specifications. Certainly during installation,
special attention should be paid to exceptional forces exceeding these specifications.
Install the mount(s) in such a way that all bottom plates are at the same level and in the same horizontal plane.
The same goes for the top plates. Always check that the load cell and/or mount are not loaded with forces
exceeding their specifications.
If large load displacements can be expected, stay rods should be applied in order to limit uncontrolled side forces.
Always use shim plates to align mounts in the same horizontal plane and level.
Routine maintenance includes the optical inspection of bolts, plates and force bearing parts, as well as the removal
of dirt, dust and debris built up near or between the load cell and/or mount in order to let it move freely.
Capacity
Working height
Installation height
Mounting torque load cell
0.25
–
2t
120 mm
4.72 inch
120 mm
4.72 inch
75 Nm
55 Lb ft
5t
145 mm
5.71 inch
145 mm
5.71 inch
450 Nm
332 Lb ft
Dimensions:
Description
Dimensions 0.25
–
2t
Dimensions 5t:
Top Plate
140mm x 120mm
150mm x 150mm
Bottom Plate
200mm x 120mm
240mm x 150mm
Total Height
120mm
145mm
Hex Bolt for load cell fastening
M12 x 70
M18 x 80
Hex Bolt for adjusting lift off protection
M8 x 20
M8 x 20
Hex Bolt for lift off protection
M16 x 20
M16 x 20
Hex Bolt for transport plate/earthing cable fastening
M8 x 12
M8 x 12
Note:
Please refer to the parts list on page 5 for an overview of all parts of the mount.