
©
2009 IMPCO Technologies, Inc.
-24-
2009 3.5/3.9L Impala CNG
Q. Initial Engine Start:
1) After making all fuel system leaks and
installation inspections:
•
Switch the changeover switch to Gasoline
operation (red FOIL).
•
Connect an OBD-II scan tool to the OEM
DLC connector.
•
Connect the Sequent DLC cable to the
vehicle and the laptop.
•
Open the Sequent P&D software and start
the engine.
•
With the OBD-II scan tool, verify there are
no pending or hard codes. If any codes
appear, diagnose the cause and repair
before continuing.
2) Let the engine warm up to operating
temperature, then depress the changeover
switch for gaseous operation position.
When the system begins changing over to
CNG operation the engine should continue
running without hesitation or stumbling. If
the engine begins running rough during the
changeover cycle, then 2 or more of the
injector connectors are misplaced. Perform
the Injector Changeover Test [Diagnostics
section of the
Sequent P&D Display
Software User Manual (Cert)
].
R. Sequent “Delta-P” Pressure Adjustment:
1. With the engine idling, running on CNG and
at operating temperature, open the display
software and select the “Delta P” pressure
for graphing (see the Diagnostics section in
the
Sequent P&D Display Software User
Manual
for graphing instructions). The
“Delta P” pressure should be averaging at
approximately 2000 mbar. If it is not, make
adjustments with a 4 mm allen wrench at
the regulator.
Содержание IMPALA 3.9L 2009
Страница 1: ...Rev B...
Страница 30: ......