background image

into  the  newel  connector  using  the  45mm 
bolt  and  spacer  provided,  making  sure  the 
chamfered end goes into the hole first. Finish 
off by inserting the cover cap (fig. 8).

With  the  handrail  connector  secure,  cut  the 
handrail at a 90

angle in line with the newel 

post, leaving 20mm protruding at the bottom 
of the handrail (

this can be altered to achieve a 

larger or smaller gap, 20mm will leave a 10mm 
gap

).  You can now fit the end cap securing 

with two 30mm screws provided. (fig. 8).

Baluster Assembly

Please Note;

When assembling the baluster brackets onto a baluster 
tube, remember to slide the baluster bracket covers onto 
the  tube  first  followed  by  the  tube  bung  and  finally  the 
baluster  bracket,  then  lie  each  baluster  bracket  onto  a 
separate piece of wood to ensure that they are both level/
square  with  each  other.    Now  tighten  the  fixing  screws 
prior to sliding the baluster bracket cover over the baluster 
bracket, the baluster assembly is now ready to be fixed 
on the hand/base rails (fig. 9).

All holes for fixing the baluster brackets should be pre-drilled.  The 
bottom baluster should be fixed vertically no more than 99mm from 
the narrowest part of the newel post, in the same way as the top 
baluster was previously (fig. 10).

In order to space the remainder of the balusters evenly measure 
the distance in mm between the centre points of the 2 balusters 
already fitted and divide by 148.5.  Round the answer up to the next 
whole number and divide the whole number back into the original 
measurement and this will give you the exact spacing (fig. 10).

Example  -    2264mm  between  centre  points  of  balusters  divided 
by 148.5mm = 15.25, rounded up to 16, then take the Evolutional 
measurement  2264mm  divided  by  16  =  141.5mm  which  is  the 
exact spacing measurement.

Pre-drill all holes for the baluster brackets after marking their position 
on  the  hand  rail  and  base  rail,  using  the  spacing  measurement 
from the previous step.

axxys

®

 evolution 

fitting instructions

www.axxys.co.uk

Содержание axxys evolution

Страница 1: ...fitting instructions axxys evolution www axxys co uk...

Страница 2: ...ed to suit any staircase pitch between 38o 45o Please Note Cheshire Mouldings axxys evolution is a factory pre finished system therefore when handling and installing please take extra care in order to...

Страница 3: ...the stair string and front edge of the riser concerned and must be a minimum of 81x81xmm square if they measure less the sides will have to be built up using suitable material They must also have enou...

Страница 4: ...Before you start slide the evolution newel post into the collar to make sure it fits snug If the newel is too tight the spigot on the bottom of the newel must be eased so it slides into the collar th...

Страница 5: ...handrail Slide the connector onto the handrail and secure using the two 30mm screws provided Now loosly assemble the remaining half of the bracket using the bolt and two washers provided fig 6 Then w...

Страница 6: ...cover over the baluster bracket the baluster assembly is now ready to be fixed on the hand base rails fig 9 All holes for fixing the baluster brackets should be pre drilled The bottom baluster should...

Страница 7: ...l on the Rake If your staircase is longer than 3 9m measured between inside newel faces then you will require an intermediate newel for added strength This will require an additional newel base to be...

Страница 8: ...found at the back of this booklet slide them into the elbow from either side and check that the handrails pass the screw holes Then pre drill and secure the handrails using the four screws supplied a...

Страница 9: ...ate it any angle between 90o to 180o to suit a multitude of configurations First your intermediate Landing Newel must be installed using the dimensions from the earlier instructions for the Top Newel...

Страница 10: ...notes www axxys co uk...

Страница 11: ...axxys evolution 90o Elbow Template www axxys co uk...

Страница 12: ...is a resistered trademark of Cheshire Mouldings Ltd Axxys Stair Balustrade is Available to Order Through Stairplan Ltd Hortonwood 1 Telford Shropshire TF1 7GN Phone 01952 216000 www stairplan com www...

Отзывы: