CHESHIRE MOULDINGS axxys evolution Скачать руководство пользователя страница 8

axxys

®

 evolution 

fitting instructions

90

o

 Elbow for

Return Landings

Please Note;

When  using  a  combination  of 
the  90

o

  Elbow  (AXLQT)  and  the 

Landing  Handrail  Connector 
(AXEVLHC) to form a return landing, 
the  minimum  distance  you  can 
achieve is 140mm from the centre 
of  the  staircase  baserail  to  the 
centre of the landing baserail.

If  you  have  a  return  landing, 
then  our  90

o

  Elbow  (AXLQT) 

can  be  used  to  achieve  this, 
in  conjunction  with  a  Landing 
Handrail Connector (AXEVLHC) 
and short piece of handrail.

Simply  mitre  the  handrails  using  the 
template supplied (found at the back of 
this booklet), slide them into the elbow 
from  either  side  and  check  that  the 
handrails  pass  the  screw  holes.    Then 
pre drill and secure the handrails using 
the four screws supplied and glue from 
underneath (fig. 13).

Lie the assembly on top of the baserail  
and  behind  the  newel,  then  measure 
the  cut  off  point  for  the  short  piece 
of  handrail  against  the  newel  face, 
remembering  to  include  the  connector 
tolerance and to ensure the handrail is 
in line with the baserail.  Cut the handrail 
at the point you have just marked.

Now  slide  the  short  handrail  end  into 
the  Landing  Handrail  Connector,  and 
secure  using  the  two  30mm  screws 
provided.    The  completed  assembly 
should look like the illustration to the left 
(fig. 14).

www.axxys.co.uk

Содержание axxys evolution

Страница 1: ...fitting instructions axxys evolution www axxys co uk...

Страница 2: ...ed to suit any staircase pitch between 38o 45o Please Note Cheshire Mouldings axxys evolution is a factory pre finished system therefore when handling and installing please take extra care in order to...

Страница 3: ...the stair string and front edge of the riser concerned and must be a minimum of 81x81xmm square if they measure less the sides will have to be built up using suitable material They must also have enou...

Страница 4: ...Before you start slide the evolution newel post into the collar to make sure it fits snug If the newel is too tight the spigot on the bottom of the newel must be eased so it slides into the collar th...

Страница 5: ...handrail Slide the connector onto the handrail and secure using the two 30mm screws provided Now loosly assemble the remaining half of the bracket using the bolt and two washers provided fig 6 Then w...

Страница 6: ...cover over the baluster bracket the baluster assembly is now ready to be fixed on the hand base rails fig 9 All holes for fixing the baluster brackets should be pre drilled The bottom baluster should...

Страница 7: ...l on the Rake If your staircase is longer than 3 9m measured between inside newel faces then you will require an intermediate newel for added strength This will require an additional newel base to be...

Страница 8: ...found at the back of this booklet slide them into the elbow from either side and check that the handrails pass the screw holes Then pre drill and secure the handrails using the four screws supplied a...

Страница 9: ...ate it any angle between 90o to 180o to suit a multitude of configurations First your intermediate Landing Newel must be installed using the dimensions from the earlier instructions for the Top Newel...

Страница 10: ...notes www axxys co uk...

Страница 11: ...axxys evolution 90o Elbow Template www axxys co uk...

Страница 12: ...is a resistered trademark of Cheshire Mouldings Ltd Axxys Stair Balustrade is Available to Order Through Stairplan Ltd Hortonwood 1 Telford Shropshire TF1 7GN Phone 01952 216000 www stairplan com www...

Отзывы: