background image

www.cglifesciences.com 

 

 

[email protected] 

Read Entire Assembly Instructions Before You Begin. Familiarize Yourself with All of the Parts, 

and Pay Close Attention to All Notes and Highlights.

 

Support frames are shipped via common carrier and require loading dock access with a fork lift or 

jack. If you do not have a loading dock, then a lift gate-equipped truck must be requested at the 

time of order. 

 

For your convenience, the unjacketed process filter reactor, the fully assembled reactor head, stirrer 

shaft & agitators, Tru-Stir™ stirrer shaft coupling, PTFE stirrer bearing, temperature probe & adapter, and 

motor are shipped assembled on the support frame. PTFE sleeves and keck clips are available 

separately. 

 

Unpack all of the parts and check against the packing slip to make sure you have received all 

necessary components. If possible, keep some of the packaging materials from the wood crates in 

case you need to return items for repair or replacement. 

 

Crate # 1: 

 

Unpack the support frame with reactor and components by removing the plastic electrical 

ties that hold the reactor in place and remove the cardboard/foam packing from around the 

reactor. Re-tighten all of the Allen screws with the supplied wrenches, adjust all black knobs 

and tighten torque knobs. The red silicone pad should be touching the straight section of the 

glass below the reactor flange. CHECK ALL ALLEN SCREWS BEFORE PROCEEDING; SCREWS CAN 

LOOSEN DURING SHIPMENT. 

 

Attach the Tru-Stir™ stirrer shaft coupling to the 1/4 HP electric stirrer motor. 

 

Crate # 2: 

 

Contains the condenser, 0-14mm drain valve, temperature monitor, motor controller, and 

other miscellaneous parts. 

 

Move the reactor assembly and parts near the hood or area where the reactor will be used, but 

allow enough space to move freely around the support frame. During setup, preparation, and 

process, it is best to keep the wheels in their locked position by stepping down on the tab. 

 
 
 
 
 

 
 
 
 

 
 
 
 
 

 

Black Knobs for 

Vertical Height 

Adjustment 

Torque 

Knobs 

Содержание CG-1959-U1000

Страница 1: ...8360 Phone 800 843 1794 Fax 800 922 4361 ASSEMBLY INSTRUCTIONS FOR UNJACKETED BENCHTOP FILTER REACTOR SYSTEMS Support Frame with Oversized Rugged S S Uprights and Heavy Duty PTFE Coated Aluminum Fitti...

Страница 2: ...om the wood crates in case you need to return items for repair or replacement Crate 1 Unpack the support frame with reactor and components by removing the plastic electrical ties that hold the reactor...

Страница 3: ...0 Small Kwik Klamp II 1ea CG 3498 03 90 Support Rod 1 The support frame has a universal motor mount It can be used with an vertical or horizontal electric air or optional explosion proof XP motor The...

Страница 4: ...embly CG 2095 slides over the end of the shaft The height from the bottom will depend on the total volume you intend to run in the reactor 3 Once you have the upper agitator in place tighten the compr...

Страница 5: ...it is pushed down on all edges evenly 5 Wrap the lower outlet adapters with NPT end with PTFE tape Thread the adapter into the filter base until it becomes snug DO NOT OVER TIGHTEN 6 Attach the beade...

Страница 6: ...vessel lid onto the vessel carefully insert the end of the stirrer shaft through the 45 50 center neck of the lid PLEASE NOTE THE MECHANICAL SEAL STIRRER BEARING IS NOT INSERTED IN THE HEAD AT THIS TI...

Страница 7: ...www cglifesciences com technical service cglifesciences com...

Страница 8: ...www cglifesciences com technical service cglifesciences com...

Страница 9: ...uch as 20 mA or 10 V Zener barriers contain intrinsically safe circuits that are to be used to drive intrinsically safe field devices with hazardous area The manufacturer s data sheets must be consult...

Отзывы: