![Checkmate ecoAnch2or Скачать руководство пользователя страница 5](http://html.mh-extra.com/html/checkmate/ecoanch2or/ecoanch2or_user-manual_2595008005.webp)
User Manual
Page 5
Issue 3
ecoAnch
ecoAnch
2
2
or
or
®
Section 3.0
Section 3.0
Before Use
Only ONE person may be attached to the anchor at any time.
Minimum ground clearance 3.5 metres.
Minimum distance from edge 2.5 metres.
The anchor MUST NOT be used in the following conditions:
Where there is a risk of frost or in freezing conditions
Where there is contamination of the roof surface and/or anchor by oil, grease or other
lubricants, or by algae.
The anchor is approved for use ONLY on the following surfaces at a maximum pitch of 5 degrees
(1 in 11) within the scope of the PPE directive EN795 Class E.
Concrete
Tarmac
Felt & mineral
EPDM membrane
Felt & chippings (loose chippings must be removed)
For a full list of approved surfaces & roof angles please see “ecoAnch
2
or
®
supplement” available on request from Checkmate.
Before use ensure that the surface you are working on is capable of supporting the weight
of the anchor. The weight of the anchor when full is 430kg with a distributed load of 273kg
per square metre.
Inspect the anchor for signs of damage or leakage. Inspect the attachment point for signs of wear
or damage. Do not use the anchor if either the bag or attachment point show signs of damage.
If the anchor is used on a roof surface of felt & chippings, loose chippings must be removed from
the area where the anchor is to be positioned (e.g. by sweeping with a stiff brush) before
deployment of the anchor.
Installation & System Setup
Installation & System Setup
Содержание ecoAnch2or
Страница 1: ...User Manual ...