background image

Confirming the Build Numbers 

 

Configuring Check Point 21400 VSX

     Page 14 

 

2.  Configure the 

Per Virtual System State

. This feature is required for the 

Virtual System Load Sharing 

(VSLS)

 

Enter 

when prompted to enable this feature. 

 

If you do not intend to use these features, enter 

n

.  

 

Note

 - You can use the 

cpconfig 

CLI command to change the VSX clustering 

settings. 

 

Completing the Configuration 

Complete the last steps of the First Time Wizard. The appliance reboots and is configured according to your 
settings. To use the VSX appliance, you must configure and install a security policy according to the 

VSX 

NGX R67 Administration Guide

 

(

http://supportcontent.checkpoint.com/documentation_download?ID=10165

). 

To complete the First Time Wizard and reboot the appliance: 

1.  You can add a license. 

2.  Enter and confirm a SIC activation key. This key establishes SIC trust between the gateway and the 

management server. 

3.  If VSX clustering features are enabled, you can enable ClusterXL for 

Active/Standby Bridge Mode

4.  Enter 

to reboot the appliance. 

 

Confirming the Build Numbers 

Confirm that the system has the most recent build numbers. Run these CLI commands to display the build 
number for these products. 

Product 

Command 

VSX Appliance Build 

SecurePlatform 
VSX 

ver 

This is Check Point SecurePlatform Pro VSX 
NGX R67.10 Build 012.

 

Dynamic Routing 

gated_ver 

650000001 

VSX 

fw ver -k 

This is Check Point VPN-1 VSX NGX R67.10 - 
build 006.

 

kernel: NGX R67.10 - Build 006.

 

Performance Pack 

sim ver -k 

This is Check Point Performance Pack 
version: NGX R67.10 - build 003.

 

Kernel version: NGX R67.10 - Build 003.

 

 

 

Содержание 21400 VSX G-50

Страница 1: ...24 November 2011 Getting Started Guide Check Point 21400 VSX R67 10 P N 704712 Models G 50...

Страница 2: ...heck Point assumes no responsibility for errors or omissions This publication and features described herein are subject to change without notice RESTRICTED RIGHTS LEGEND Use duplication or disclosure...

Страница 3: ...ckpoint com documentation_download ID 12528 For additional technical information visit the Check Point Support Center http supportcenter checkpoint com Revision History Date Description 24 November 20...

Страница 4: ...RECOMMENDED BY THE MANUFACTURER DISCARD USED BATTERIES ACCORDING TO THE MANUFACTURER S INSTRUCTIONS Disconnect the system board power supply from its power source before you connect or disconnect cabl...

Страница 5: ...is your responsibility to dispose of your waste equipment by handing it over to a designated collection point for the recycling of waste electrical and electronic equipment The separate collection an...

Страница 6: ...Rear Panel 15 Check Point 21400 VSX Front Panel 15 Check Point 21400 VSX Front Panel LEDS 16 Managing Check Point 21400 VSX Using the LCD Panel 17 Line Cards 18 Check Point 21400 VSX Rear Panel 19 Cu...

Страница 7: ...ally suited for securing medium to large data center environments and high end enterprise networks The Check Point 21400 VSX model is purpose built Security Gateways in a compact 2U form factor The Ch...

Страница 8: ...ents Virtual routers Virtual switches Virtual cabling Wire Speed Security for Gigabit Networks High Availability with Linear Growth Clustering Bridge Mode Support for Transparent Internal Firewalls Fl...

Страница 9: ...Shipping Carton Contents Introduction Page 9 Item Description Cables 2 power cords Documentation Getting Started Guide User License Agreement...

Страница 10: ...0 Chapter 2 Mounting the Appliance in a Rack To learn how to mount the Check Point 21400 VSX in the rack see the 21000 Appliances Rack Mounting Guide http supportcenter checkpoint com file_download id...

Страница 11: ...ntation_download ID 10165 Security Management Server is not installed locally on Check Point 21400 VSX In This Chapter Powering On 11 Initial Configuration 12 Confirming the Build Numbers 14 Powering...

Страница 12: ...g in for the first time using admin as the default username and password 5 Follow the on screen instructions and change the password 6 Log in to expert mode a Enter expert b Enter the new admin passwo...

Страница 13: ...default gateway of the network 10 Enter e twice to return to the Network Configuration menu 11 Enter n The Time and Date Configuration window opens Setting Network and Time Date Properties To set the...

Страница 14: ...d ID 10165 To complete the First Time Wizard and reboot the appliance 1 You can add a license 2 Enter and confirm a SIC activation key This key establishes SIC trust between the gateway and the manage...

Страница 15: ...ystem power system status and hard disk activity 2 LCD display screen 3 Keypad for LCD screen 4 2 Hard disk drives When monitoring the disks using the raid_diagnostic command DiskID 0 is the top disk...

Страница 16: ...escription 1 System Power OFF System power off ON Green System power on 2 System Status Green System OK Orange Alarm for voltage temperature or fan 3 Hard disk drive HDD Activity OFF No HDD Activity O...

Страница 17: ...ernal IP or Set Mgmt IP Set the management interface IP address Set Netmask Set the management interface network mask Set Default GW Set the management interface default gateway System Reboot Reboot t...

Страница 18: ...optic short range Black Fiber optic long range Blue 2 1GbE SFP Line Card 12 Port 12 port 1Gb Ethernet PCI e line card for SFP transceivers Fiber optic short range Black Fiber optic long range Blue Co...

Страница 19: ...button When a power supply fails or is not connected to the outlet an alarm sounds continuously Press here to turn off the alarm 5 Grounding plug 6 5 replaceable CPU cooling fans behind the grille Eac...

Страница 20: ...Cooling Fans 28 Installing and Removing the System Board Battery 29 Installing and Removing a LOM Card 30 Installing and Removing Line Cards This section presents the procedures for removing and insta...

Страница 21: ...scription Supported Transceivers Latch Lever Color 1 10GbE SFP Line Card 4 Port 10 Gb Ethernet PCI e line card for SFP transceivers Fiber optic short range Beige Fiber optic long range Blue 2 1GbE SFP...

Страница 22: ...2 Turn the transceiver latch lever down to secure the transceiver in the Line Card 3 Insert a correct interface cable into the transceiver To remove a transceiver 1 Remove the cable 2 Release the tran...

Страница 23: ...power supply unit To prevent damaging the power supply do not pull on the retaining screw power cord clip or any other part of the unit 4 If the alarm sounds press the red Alarm Off button to the righ...

Страница 24: ...to the slot 2 Turn the ejector handle to the closed position 3 Press on the hard disk drive until it sits in its connector To do this apply pressure at the same time on the Right side of the bezel usi...

Страница 25: ...tatus of the disks Using SNMP set up SNMP traps to send information about the RAID Use OID 1 3 6 1 4 1 2620 1 6 7 7 To Hot Swap a disk Important Make sure that at least one fully synchronized disk is...

Страница 26: ...To add or replace DIMMs 1 Power down the appliance and remove the lower tray a Use the CLI to shut down the appliance b Press the power switch at the rear of the appliance to turn off power to the ap...

Страница 27: ...ition The top of the DIMM is smooth The bottom edge has two different length sets of contacts which connect to the slots on the socket Be sure the contacts and slots are correctly aligned before you i...

Страница 28: ...e can overheat if they are not cooled even for a short period of time If you replace a failed fan unit and do not completely remove power to the appliance do not let the appliance run without a fan un...

Страница 29: ...Replace the battery only with the same or equivalent type that the manufacturer recommends Dispose of used batteries according to the manufacturer s instructions Warning Make certain that you removed...

Страница 30: ...nce 6 Reset the appliance date and time information using the CLI It is necessary to do this because the battery keeps the date and time when you shut down the appliance Installing and Removing a LOM...

Страница 31: ...a Move the system board tray into the appliance until it clicks into position b Refasten the two retaining screws for the lower tray c Connect the power cords to the appliance d Press the power switc...

Страница 32: ...u see the message You may safely reboot your system reboot the appliance manually using the master power button Turn the appliance off and disconnect the USB CD ROM DVD ROM After several seconds press...

Страница 33: ...nformation about Check Point products consult the Check Point Support Center http supportcenter checkpoint com Where To From Here You have now learned the basics that you need to get started The next...

Страница 34: ...e following Product Specifications EMC FCC 47 CFR Part 15 Class A Information Technology Equipment Radio Disturbance Characteristics VCCI V 3 Class A Information Technology Equipment Radio Disturbance...

Страница 35: ...e product herewith complies with the requirements of the EU Directive 2006 95 EC and the EMC Directive 2004 108 EC Date and Place of issue July 2011 Tel Aviv Israel FCC Notice US This equipment has be...

Отзывы: